ML19309E309

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 70-1100/79-09
ML19309E309
Person / Time
Site: 07001100
Issue date: 03/18/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lichtenberger H
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML19309E310 List:
References
NUDOCS 8004210126
Download: ML19309E309 (1)


Text

-_

7%

4 UNITED STATES 1

l

[

j NUCLEAR REGULATORY COMMISSION l

5 g

REGION 1 C

g 631 PARK AVENUE 4,*****,e KING OF PRUSSIA, PENNSYLVANIA 1940s Docket No. 70-1100 tm 13 g3 Combustion Engineering, Inc.

ATTN: Mr. H. V. Lichtenberger Vice President - Nuclear Fuel Nuclear Power Systems - Manufacturing P.O. Box 500 Windsor, Connecticut 06095 Gentlemen:

Subject:

Inspection 70-1100/79-09 This refers to your letter dated March 3,1980, in response to our letter dated February 14, 1980.

Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a subsequent inspection of your licensed program.

With respect to Item E(2) of the Notice of Violation appended to our letter dated November 13, 1979, we have reviewed the information supplied in your letter of March 3,1980 and additional information obtained during a telephone conversation between Mr. Bakevich of your staff and Mr. Roth of this office on March 17, 1980. Based on this information, we concur that Item E(2) is not an example of noncompliance.

Item E(2) has been deleted from our records as an example of noncompliance.

Your cooperation with us is appreciated.

Sincerely, Gear e

. Smith, Chief Fuel F ility and Materials Sa ety Branch 3 0 0 4 l

(

. -