Immediate Action Ltr Re Deficiencies in Implementation of QA Requirements Concerning Site Work Being Performed by Zack Corp
ML19309E306
Person / Time
Site: Midland
Issue date: 03/21/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8004210124
Download: ML19309E306 (2)


Text

IMMEDIATE ACTION LETTER g ucy 8

'o UNITED STATES

['

" '/g NUCLEAR REGULATORY COMMISSION TIC j

.c c

REGION 111

%... + e'['

799 ROOSEVELT ROAD 0,

GLEN ELLYN,ILLINOls 60137 itAR 21 $80 s

Ifocket No. 50-329 Docket No. 50-330 Consumers Power Company i

ATTN:

Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:

This r?fers to the telephone conversation between you and G. Fiorelli and others of our staff on March 20, 1980, regarding deficiencies in the implementation of QA requirements related to work bein,done at the Midland plant site by the Zack Corporation.

We acknowledge that Consumers Power and Bechtel had previously identified a number of problems and had initiated steps to correct these problems.

In spite of those efforts, our investigation conducted during the week of March 17, 1980 confirmed some instances of continued nonconformances in the implementation of Zack's Quality Assurance Program.

Based on our conversation, we understand that you:

1.

Have issued a stop work order to the Zack Corporation for all its safety related construction activities related to site fabrication 1

and installation of equipment.

2.

Will not proceed with site heating and ventilating safety related work until such time as Consurers Power and the NRC agree that the quality assurance program efforts meet regulatory requirements.

An important factor to the NRC agreeing to the resumption of work will be a review by Consumers Power ar.d Bechtel of Zack's QA program to insure that all procedures, personnel qualification, material control including certification and inspections to demonstrate conformance to requirements, have been satisfactorily completed prior to installing or fabricating components.

l N EDIATE ACTION LETTP 80042} %,

IMMEDIATE ACTION LETTER 4

Consumers Power Company grg 1 ggg l

Please inform us immediately if your understanding of these matters is different from that set forth above.

Sincerely, James G. Keppler Director cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago i

6 L

1 P

IMMEDIATE ACTION LETTER

-