ML19309E199
| ML19309E199 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/06/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19309E200 | List: |
| References | |
| NUDOCS 8004210003 | |
| Download: ML19309E199 (2) | |
See also: IR 05000423/1980001
Text
g -.
[h
-
, gg
UNITED STATES
jo
NUCLEAR REGULATORY COMMisslON
y
o
REGION I
$
$
63'1 P AR K AVENUE
'f
KING OF PRUSSI A, PENNSYLV ANI A 19406
.....
HA2 061918
Docket No. 50-423
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
,
P. O. Box 270
Hartford, Connecticut 06101
.
Gentlemen:
Subject:
Inspection Report No. 50-423/80-01
This refers to the inspection conducted by Mr. A. Cerne of this office
on February 13-15, 1980 at the Millstone Nuclear Power Station, Unit 3,
at Waterford, Connecticut of activities authorized by NRC License No.
CPPR-113 and to the discussions of our findings held by Mr. Cerne with
Mr. S. Toth and others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
.
Room.
If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must be accompanied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
!
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
!
hear from you in this regard within the specified period, the report
'
will be placed in the Public Document Room.
i
8 0 04 210 ooS
,
.
.
Northeast Nuclear Energy Company
2
No reply to this letter is required; however, should you have any questions
'
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
f
4=- _
-
Robert T. Carlson, Chief
,
Reactor Construction and Engineering
i
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report No.
50-423/80-01
7
cc w/ encl:
K. W. Gray, Construction Quality Assurance Lead
,
H. R. Nims, Director of Nuclear Projects
'
J. F. Opeka, Station Superintendent
J. R. Himmelwright, Licensing Safeguards Engineer
,
l
!
l
.
.
-
- - - - -