ML19309E040

From kanterella
Jump to navigation Jump to search
Forwards Attachments to IE Circular 80-03, Protection from Toxic Gas Hazards, Inadvertently Omitted from 800306 Transmittal
ML19309E040
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/02/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 8004180048
Download: ML19309E040 (1)


Text

'

N

[ "w,,'o#

gd j

UNITED STATES E'

' 7, NUCLEAR REGULATORY COMMISSION

,",,'. ' E k

REGION lli o,

799 ROOSEVELT ROA9 8

GLEN ELLYN, ILLINOIS 60137 o

Docket No. 50-409 APR 2 580 Dairyland Power Cooperative ATTN:

Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:

IE Circular No. 80-03 dated March 6, 1980, was inadvertently sent to you without the enclosed attachments. We are sorry for any inconvenience this may have caused you.

Sincerely, 6_u$[M mu

=

8JamesG.Kepp Director Attachments: Sections 2.2.1-2.2.2; 2.2.3 and 6.4 of NUREG 75/087 cc w/ attach:

Mr. R. E. Shimshak, Plant Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Mr. John J. Duffy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations l

l oj..E'!y Q

s004180

m u

NUREG 75/087 c ppates%

/

U.S. NUCLEAR REGULATORY COMMISSION g 3,

g STANDARD REVIEW PLAN l

OFFICE OF NUCLEAR REACTOR REGULATION SECTION 6.4 HABITABILITY SYSTEMS REVIEW RESPONSIBILITIES Primary - Accident Analysis Branch (AAB)

Secondary - Hydrology-Metenrology Branch (HMB)

Auxiliary Systems Branch (ASB)

Effluent Treatment Systems Branch (ETSB)

AREAS OF REVIEW The control room ventilation system and control building layout and structures, as described in the applicant's safety analysis report (SAR), are reviewed with the objective of assuring that plant operators are adequately protected against the effects of accidental releases of toxic or radioactive gases. A further objective is to as,ure that the control room can be maintained as the center from which emergency teams can safely operate in the case of a design basis radiological release. To assure that these objectives are accom-plished the following items are reviewed:

1.

The zone serviced by the control room emergency ventilation system is examined to ascertain that all critical areas requiring access in the event of an accident are included within the zone (control room, kitchen, sanitary facilities, etc.) and to assure that those areas not requiring access are generally excluded from the 2one.

2.

The capacity of the control room in terms of the number of people it can accommodate for an extended period of time is reviewed to confirm the adequacy of emergency food and medical supplies and self-contained breathing apparatus and to determine the length of time the control room can be isolated before C0 levels become excessive.

p 3.

The control room ventilation system layout and functional design is reviewed to determine flow rates and filter efficiencies for input into the AAB analyses of the buildup of radioactive or toxic gases inside the control room, assuming a design basis release. Basic deficiencies that might impair the effectiveness of the system are examined. In addition, the system operation and procedures are reviewed. The ASB has primary responsibility in the system review area under Standard Review Plan (SRP) 9.4.1.

The ASB is consulted when reviewing hardware and operating procedures.

i i

l 4

A USNRC STANDARD R

-t::~ ;;'":.';:.*~. *~ '.'.".* -

"*.:.N""::';:="

DUPLICATE DOCUMENT W

  • --* **'",y,,',,*l.:;.L.. -* ;;,,=* 7,.,.,,,

,;;;ll.,,';=;,.;'l; g.

t Entire document previously entered

- - - w

=. i.

into system under:

c

==

e.a.vu n s

.O C.EEE ANO ll0 /0200 & $

No. of pages:

M 9

9 r

--