Supplements 740814 Response to AEC Re Violations Noted in Insp Rept 50-313/74-10.Corrective Actions:Special Processes Procedures Revised & Will Be Reviewed Prior to Implementation.Incore Tube Integrity Assured by Hydrotest
ML19309D955
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/29/1974
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309D926 List:
References
NUDOCS 8004110757
Download: ML19309D955 (2)


Text

.. _ _ _ _.

.(]

m l'

neterna aurto annannso A R K A N S A S P O Vv E R S LI G H T C O fv1 P A N Y GTH AVENUE AND AINE STREET

  • PINE BLUFF, AAKANSAS 71601 e (501) 534-1330 August 29, 1974 United States Atomic Energy Commission Directorate of Regulatory Operations Region II 230 Peachtree Street, N.W., Suice a18 Atlanta, Georgia 30303 Attention: Afr. Noman C. Moseley, Director

Subject:

Arkansas Pcwer 6 Light Company Arkansas Nuclear One - Unit 1 RO:II:MSK 50-313/74-10 Ge'ntlemen:

bl We are submitting this as a supplement to our previous response, dated g's August 13, 1974, to the apparent violations as detailed in the above report.

1.A.l.a

" Procedure Review of Special Processes" Procedure 1701.01, " Repair of Incore Instrument Tubes" has been reviewed by the QCE on 8/6/74 and Technical Support Engineer on 8/7/74 with no deficiencies noted. Procedure No.1005.02, " Handling of Procedures", has been revised as of 6/10/74. As per this revision, any special procedures covered under 1004.07, " Control of Special Processes", will be forwarded to the cognizant supervisor for review by the Plant Safety Committee Secretary before the final approval and implementation.

1.A.1.c

" Failure to Log Significant Annunciations"

~

The revision to 1005.01 " Administrative Control Ibnual" as noted in our previous response has been signed by the Plant Superintendent and implemented as of 8/5/74.

1.A.2.b

" Failure to Document Inspection of Socks Placed Over The Ends of Incore Tube Nozzles to Accumulate Cuttings During l

Flushing" l

p 5 s ur ro: ng /

Q

)

NS1c}xi LPDR TZc g

.- 4%...--.8004120 7 D

~

e.

c United States Atomic' 'icrgy Comission

'agust 29, 1974 An inspection report was prepared on August 23, 1974 to document the fact

. that we did inspect the shavings, but there was no way to make any defi-nite conclusions from the inspection.

In lieu of the inspection of shavings, 4

the integrity of the incore tubes was assured by hydrotest to 4,000 psi.

J Very truly yours,

<- /

  • ,p

~

J. D. Phillips Senior Vice President 1