ML19309D955
| ML19309D955 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/29/1974 |
| From: | Phillips J ARKANSAS POWER & LIGHT CO. |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19309D926 | List: |
| References | |
| NUDOCS 8004110757 | |
| Download: ML19309D955 (2) | |
Text
.. _ _ _ _.
.(]
m l'
neterna aurto annannso A R K A N S A S P O Vv E R S LI G H T C O fv1 P A N Y GTH AVENUE AND AINE STREET
- PINE BLUFF, AAKANSAS 71601 e (501) 534-1330 August 29, 1974 United States Atomic Energy Commission Directorate of Regulatory Operations Region II 230 Peachtree Street, N.W., Suice a18 Atlanta, Georgia 30303 Attention: Afr. Noman C. Moseley, Director
Subject:
Arkansas Pcwer 6 Light Company Arkansas Nuclear One - Unit 1 RO:II:MSK 50-313/74-10 Ge'ntlemen:
bl We are submitting this as a supplement to our previous response, dated g's August 13, 1974, to the apparent violations as detailed in the above report.
1.A.l.a
" Procedure Review of Special Processes" Procedure 1701.01, " Repair of Incore Instrument Tubes" has been reviewed by the QCE on 8/6/74 and Technical Support Engineer on 8/7/74 with no deficiencies noted. Procedure No.1005.02, " Handling of Procedures", has been revised as of 6/10/74. As per this revision, any special procedures covered under 1004.07, " Control of Special Processes", will be forwarded to the cognizant supervisor for review by the Plant Safety Committee Secretary before the final approval and implementation.
1.A.1.c
" Failure to Log Significant Annunciations"
~
The revision to 1005.01 " Administrative Control Ibnual" as noted in our previous response has been signed by the Plant Superintendent and implemented as of 8/5/74.
1.A.2.b
" Failure to Document Inspection of Socks Placed Over The Ends of Incore Tube Nozzles to Accumulate Cuttings During l
Flushing" l
p 5 s ur ro: ng /
Q
)
NS1c}xi LPDR TZc g
.- 4%...--.8004120 7 D
~
e.
c United States Atomic' 'icrgy Comission
'agust 29, 1974 An inspection report was prepared on August 23, 1974 to document the fact
. that we did inspect the shavings, but there was no way to make any defi-nite conclusions from the inspection.
In lieu of the inspection of shavings, 4
the integrity of the incore tubes was assured by hydrotest to 4,000 psi.
J Very truly yours,
<- /
- ,p
~
J. D. Phillips Senior Vice President 1
JDP:mb d
i s
e e
l 1
i
't l
t
..