IE Insp Repts 50-440/80-01 & 50-441/80-01 on 800123-25. Noncompliance Noted:Failure to Qualify Inspector Personnel Records
ML19309D724
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 02/20/1980
From: Key W, Konklin J, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19309D708 List:
References
50-440-80-01, 50-440-80-1, 50-441-80-01, 50-441-80-1, NUDOCS 8004110176
Download: ML19309D724 (10)


See also: IR 05000440/1980001

Text

..

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report Nos. 50-440/80-01; 50-441/80-01

Docket Nos. 50-440; 50-441

License Nos. CPPR-148; CPPR-149

Licensee:

The Cleveland Electric Illuminating Company

P.O. Box 5000

Cleveland, OH 44101

Facility Name:

Perry Nuclear Power Plant, Units 1 and 2

Inspection At:

Perry Site, Perry, OH

Inspection Conducted: January 23-25 1 80

,

p

es~

8/I'f/7/'-

Inspectors:

J. E. Konklin

-

-

!

W. J. Key /

,3/fDl O

/

/

>

e~;-

Approved By.

C. C. Williams, Chief

a / 2 M [" 9

Projects Section 2

'

Inspection Summary

Inspection on January 23-25, 1980 (Report No. 50-440/80-01 and 50-441/80-01)

'

Areas Inspected: Reactor vessel recirculation nozzles safe-end modification

activities (Units 1 and 2):

licensee activities relative to the resolutica

of previously identified open items; qualifications of inspection personnel.

This inspection involved a total of 40 inspector-hours onsite by two NRC

inspectors.

Results:

Of the areas inspected, one item of noncompliance was identified

in one area (failure to follow procedure in certification of personnel -

Section II).

8004110 / 7 6

t

_ ._ ___ _

_ _ _ _ _ _ _ _

. .

\\

DETAILS

Persons Contacted

Principal Licensee Employees

D. Davidson, Vice President, System Engineering and Construction

  • M. Edelman, Manager, Nuclear QA Department
  • G. Groscup, Manager, Nuclear Engineering Department
  • W. Kacer, CQS General Supervising Engineer
  • R. Vondrasek, CQE Supervisor

Other Personnel

  • D. Fitzpatrick, Site Construction Manager (KEI)
  • R. Williams, CQE Quality Engineer
  • T. Arney, Site Program Manager (GAI)
  • P. Gibson, CQC Supervisor (KEI)

R. Sherer, CQE Quality Engineer (GAI)

R. Crofton, CQS Lead Piping Quality Engineer (GAI)

J. Mehaffey, CQS Lead Mechanical Quality Engineer (GAI)

E. Baker, QC Supervisor (GE)

G. Craigo, QC Inspector (GE)

G. Zettel, QC Inspector (GE)

J. Tsone, Welding Engineer (GE)

T. Czaplick, Auditor (GE)

L. Wheatley, Level III NDE Specialist (GE)

D. McQuarrie, Project Manager (NIC)

The inspectors also contacted and interviewed other licensee and contractor

personnel.

  • Denotes those attending the exit interview on January 25, 1980.

Licensee Action on Previous Inspection Findings

(Closed) Open Item (440/77-05; 441/77-05) Justification for samples or

analyses not performed. The previous RIII report discussed the desir-

ability of including justification in the environmental monitoring

reports for those samples or analyses which were not performed or not

reported. During this inspection the RIII inspector reviewed the monthly

sampling and analytical results of water quality transmitted in reports

from NUS Corporation to CEI, from September 27, 1977 (covering surveys of

June through August 1977) through January 4, 1980 (covering surveys during

September through November 1979). The inspector noted that, in all cases

where sample results were missing, explanatory notes had been added to

the report sheet. This item is considered to be closed.

l

l

l

-2-

. n

_-

_

&C

-

g g .L

Af

-

n ,,-

..

i

(Closed) Open Item (440/78-10; 441/78-09) Resolution of erosion problems

at the sediment control overflows. Through discussions with the licensee

and review of the environmental monitoring reports for Perry, the RIII

inspector determined that the erosion problems at the three sediment

impoundment overflows have been solved by the construction of concrete

dams to eliminate the rip-rap. The work was completed in April 1979.

This item is considered to be closed.

"

(Closed) Open Item (440/78-10; 441/78-09) Monitoring of groundwater

levels. The previous RIII report noted a CEI commitment to monitor

groundwater levels biweekly at the remaining piezometer locations.

During this inspecti

n,

the RIII inspector reviewed the continuous log

of groundwater leve

, from August 16, 1978 to January 8, 1980, and

verified that the levels have been taken at approximately two week

intervals during that time period. This item is considered to be closed.

l

l

l

I

,

-3-

.: .

b

Section I

Prepared by

J. E. Konklin

Reviewed by

C. C. Williams, Chief

Projects Section 2

1.

Review of Licensee Action on Previous Inspection Findings

The RIII inspector reviewed the licensee actions relative to the

resolution of specific open items which had been identified in

previous RIII inspection reports, and which were still in an open

status prior to this inspection.

The items reviewed, and the

licensee actions relative to the resolutions of each item, are

discussed in the foregoing section of this report.

2.

Qualification of Inspection, Examination and Testing Personnel

The RIII inspector reviewed the qualifications and certifications

of selected CEI, Kaiser Engineers (KEI) and Gilbert Associates, (GAI)

personnel engaged in inspection, examination, and testing activites,

with emphasis on the comparison of the personnel qualifications to

the requirements of ANSI N45.2.6 and the applicable Perry Plant

procedures.

CEI

The inspector reviewed CEI Program Quality Assurance Procedure

1-1001, Revision 0, dated January 26, 1979, " Qualification and

Certification of CEI Inspection and Test Personnel," and the

qualification records of nine CEI personnel, including four in-

dividuals certified to Level III and five persons certified to

-

Level II.

KEI

The inspector reviewed KEI Quality Assurance Procedure No. 20,

Revision 2, dated November 15, 1979, " Indoctrination, Training,

and Certification", and the qualification records of 25 KEI per-

sonnel, including 23 persons certified to Level II and two in-

dividuals certified to Level III.

GAI

The inspector reviewed the following GAI procedures related to

qualification of inspection, examination and testing personnel:

,

!

!

!

-4-

,

i

I

.

..

i

a.

GAI Quality Assurance Procedure QAP 2.3, Revision No. 1, dated

December 28, 1979, "Indactrination and Training of Personnel".

b.

GAI Indoctrination and Training Instruction ITI 3.1, Revision

0, dated January 30, 1978, " Qualification of Inspection, Exam-

ination, and Test Duties Other Than NDT in Accordance With ANSI

N45.2.6Property "ANSI code" (as page type) with input value "ANSI</br></br>N45.2.6" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.."

The inspector also reviewed the qualification records for 13 GAI

personnel, including five individuals certified to Level II and

eight persons certified to Level III.

Based on the review of the above procedures and qualification records,

and discussions with CEI, KEI, and GAI quality assurance personnel, the

inspector concluded that the procedures and personnel certifications

reviewed meet the intent of ANSI N45.2.6.

No items of noncompliance or deviations were identified.

,.

G

-5-

. .

Section II

Prepared by

W. J. Key

Reviewed by

D. H. Danielson, Chief

Engineering Support Section 2

The inspector conducted an inspection on January 23-25, 1980 of activ-

ities related to replacement of the N2 reactor vessel recirculation

nozzle safe-ends on Units 1 and 2.

The inspection included review of

implementing procedures, personnel qualifications and certifications,

material certifications, observations of activities and review of

records.

1.

Specification and Procedure Review

The inspector reviewed the following General Electric Installation

Service Engineering (GE I&SE) specifications and procedures.

a.

SP-65-4549-00, Revision 1

Reactor Pressure Vessel Safe-End Modification

b.

21A2039, Revision 1

Weld Metal Interface Location

c.

21A21A, Revision 3

Calding Requirements for Field Modification of Vessel Components

d.

22A6726, Revision 0

Reactor Vessel Recirculation Inlet Nozzle Installation

e.

SP-709-454540, Revision 1

Control of Quality Program Requirements for Safety Related

Installation and Erection

Implementing Procedures

a.

RM3-GQ1-0010, Revision 1

Instrument Calibration Program

b.

RM-AP-0010, Revision 1

Reactor Vessel Access

c.

RM3-D0010, Revision 2

Restraining and Position Monitoring of Recirculation Inlet

Thermal Sleeve and Jet Pump Riser

-6-

r

i

t

e

.

d.

RM3-DM-0020, Revision 4

-

Recirculation Inlet Safe-End and Thermal Sleeve Weld Preparation

Machining

e.

RM3-DM-0030, Revision 1

'

Material Marking Procedure

f.

WQ1024, Revision 2

Welder Qualification Mock-up

g.

RM3-NPT, 10-S76, Revision 1

Liquid Penetrant Examination Procedure, Color Contrast Solvent

Removable

h.

RM-HVT10-S76, Revision 2

Visual Examination

i.

RM3-NUT, 10-S76, Revision 4

Ultrasonic Examination of Dissimilar Metal Welds

j.

RM3-NRT, 10-S76,

Field Radiography Utilizing Gamma Radiation

k.

RM3-1P-0010, Revision 1

Recirculation Inlet Thermal Sleeve Extension and Safe-End

Reinstallation

1.

NDE-PQ-800, Revision 6

NDE Examination Personnel Qualification and Certification Program

.

m.

PQ1-8001, Revision 1

Inspection and Testing Personnel Qualification and Certification

Program.

Welding Procedures

a.

WPS No. 43.2.3.1, Revision 1 P43 to 43 (GTAW)

b.

WPS No. 43.2.4.2R, Rev:sion 3 (GTAW)

c.

PQ-302, Revision 0, P8 to P8 (GTAW)

d.

GWP-100, R12

General Welding Procedure for Nuclear Services Projects

e.

GWP-1001, Revision 8

General Weld Repair Procedure

f.

GWP-1003, Revision 6

Welding Performance Qualification

-7-

,

,

e,

t

g.

GWP-1003, Revision 4

Welding Performance Qualification Supplement

No items of noncompliance or deviations were noted.

2.

Personnel Qualification and Certification

The inspector reviewed the following records of quality control,

nondestructive examination, and welding personnel engaged in vessel

N2 nozzle safe-end replacement.

General Electric Installation and Service Engineering (GEI&SE)

E. R. Baker, Level III ANSI N45.2.6

G. E. Craigo, Level II ANSI N45.2.6

G. C. Zettel, Level I ANSI N45.2.6

J. M. Klopotic, Level I ANSI N45.2.6

L. W. Wheatley, Level III ASNT-TC-1A

National Inspection Consultants Inc. (NIC)

RT

UT

PT

MT

D. M. McQuarrie

II

II

II

II

M. Hannon

II

II

GEI&SE Welder Qualifications

Name

Stamp No.

M. McClure

PG-1

B. Bianchi

PG-2

C. Sanders

PG-3

L. Fusaro

PG-4

C. Kellerman

PG-5

R. Francis

PG-7

During the inspector's review of the GE I&SE qualification records,

he noted that none of the records indicate the specific activities the

GE inspectors are qualified to perform. The inspector notified the

licensee that this is an item of noncompliance with Criterion XVII of

10 CFR 50 Appendix B, and the CEI PSAR, Section 17.1.10(50-440/80-01-01;

50-441/80-01-01).

3.

Material Certifications

The inspector reviewed material certifications on the following

materials for replacement of N2 nozzle safe-ends.

-8-

l

e

.

+ 5

Weld Filler Materials

.

Chromenar 382 (spooled)

Lot. No. X4372N382

ER-308L

Heat No. 21306

Lot No. 1177

ER-108L Inserts

Heat No. 376411JN

ERNICr-3 Inserts

Heat No. NX5027D

Liquid Penetrant (PT) (Magnaflux)

Spot Check - Cleaner, SKC-FN-Batch-79G022

Spot Check - Penetrant, SK1/HF/S Batch-79F070

Spot Check - Developer SKD-NF Batch-79F142

No items of noncompliance or deviations were identifield.

4.

Observation of Activities

The inspector observed that welding of Unit No. I recirculation N2

safe-end was being performed in accordance with the approved proce-

dures, that welding activities were being performed and protected

from the elements, that joints being joined were clean of all foreign

matter, and that all equipment was being checked and properly

maintained.

,

Unit No. 2N2 recirculatior. safe-ends were being removed and weld

preparation machined in accordance with approved procedures; the

finished surfaces covered for protection and to prevent the entrance

of foreign objects into the vessel.

No items of noncompliance or deviations were noted.

5.

Documentation Review

Though all documentation for the safe-end replacements have not

arrived from GE, the material certifications and NDE examination

packages for the following safe-ends were reviewed.

Unit No. 1

Unit No. 2

Safe-End Serial No.

Safe-End Serial No.

M1-112

M1-137

M1-113

M1-138

i

!

-9-

!

i

e .

'

Unit No. 1

Unit No. 2

'

Safe-End Serial No.

Safe-End Serial No.

M1-114

M1-139

M1-115

M1-140

M1-117

M1-141

M1-118

M1-132

M1-121

M1-133

M1-120

M1-134

M1-204

M1-135

M1-205

M1-136

Exit Interview

The inspectors met with site staff representatives (denoted under Persons

Contacted) at the conclusion of the inspection on January 25, 1980. The

inspectors summarized the purpose and results of the inspection. The

licensee achnowledged the findings reported herein.

!