ML19309D318

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-329/80-04 & 50-330/80-04 on 800212-15.No Noncompliance Noted
ML19309D318
Person / Time
Site: Midland
Issue date: 03/03/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19309D319 List:
References
NUDOCS 8004100245
Download: ML19309D318 (2)


See also: IR 05000329/1980004

Text

TIC

pw,

  • I

J

o

UNITED STATES

-

[ ., ,,,.,

~ g

NUCLEAR REGULATORY COMMISSION

r

REGION lli

.

o,,

f

799 ROOSEVELT ROAD

%,

f

GLEN ELLYN. ILUNOIS 60137

  • se**

MAR 3M

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATTN:

Mr. Stephen II. Ilowell

Vice President

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Mr. E. J. Gallagher of this

office on February 12-15, 1980, of activities at the Midland Nuclear

Plant, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81

and No. CPPR-82 and to the discussion of our findings with Messrs. T. C. Cooke

and J. L. Corley and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. The inspection consisted of an examination of the

continuing exploratory soil borings program and settlement monitoring of

plant area fill.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must in-

clude a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary inform-

ation identified in the application is contained in an enclosure to the

application.

8004100 h,

t

. .

-

.

-

.

.

_ _ _

_

,

i,.

'

Consumers Power Company

-2-

3.

,

We will gladly discuss any questions you have concerning this

,_

!

inspection.

I

Sincerely,

i

s

WMc

b

.

,

Gaston Fiorelli, Chief

i

Reactor Construction and

]

Engineering Support Branch

Enclosure:

IE Inspection

,

Reports No. 50-329/80-04

'

and No. 50-330/80-04

I

cc w/ encl:

i

Central Files

Reproduction Unit NRC 20b

'

PDR

!

Local PER

!

NSIC

,

TIC

4

,

Ronald Ca'.len, Michigan Public

I

Service Commission

Myron M. Cherry, Chicago

.,

T

!

t

b

5

J

!

l

.

1

1

1

,

6

L

__

r_-.

, . ,

,, _~

,,.m.

_,-,,,. .-,. , , , , , , . _ .

. , , - - . _ ,

,

,, -- _ . . , , - , _ . -

_

. , , . -