ML19309D255

From kanterella
Jump to navigation Jump to search
Requests Controlled Set of P&Ids.Submittal Should Be Forwarded to Attention of Region 3 Incident Response Ctr within 20 Days
ML19309D255
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/20/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8004100172
Download: ML19309D255 (1)


Text

Tl0 v ** %,

UNITED ST ATES a

(('

NUCLEAR REGULATORY COMMISSION

?>

REGloN H1

'l ss noosevrLT aoAo k

GLEN E LLYN, ILLINOIS 6013 7 E O NO Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:

Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:

In an effort to upgrade our incident response capability, we are requesting your assistance in providing this office with a controlled set of Piping and Instrumentation Diagrams (P&ID's) for your Point Beach Plant.

Since these documents will become part of our reference library located in our Incident Response Center, they should be forwarded to the attention of the Realon III Incident Response Center for prompt handling.

We request that you provide these diagrams within 20 days of your receipt of this letter.

Your cooperation is appreciated.

Sincerely,

-y h

  • *7 %

ames G. Kepp er Director cc:

Mr. C. A.

Reed, Manager Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy 8004100 / y 2