ML19309D225

From kanterella
Jump to navigation Jump to search
Forwards Waste Packaging Insp Rept 79-07A on 791212-13.No Noncompliance Noted
ML19309D225
Person / Time
Site: Dresden, Quad Cities, Zion, 02700047
Issue date: 02/22/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19309D228 List:
References
NUDOCS 8004100140
Download: ML19309D225 (2)


Text

!

' \\

s28 H4 UNIT E D ST AT ES 9

9 f$

k NUCLEAR REGULATORY COMMISSION i

d o

Rf.GION til 5

~f 799 ROOSEVELT ROAD ctEN ELovn. stusois sons

((,8221980 Docket No. 50-10, 50-237, 50-249 Docket No. 50-254, 50-265 Docket No. 50-295, 50-304 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Centlemen:

This refers to an unannounced inspection conducted by R. L. Woodruff.

and W. W. Peery of our Region II office on December 12-13, 1979.

A shipment of radioactive waste shipped from your facility was inspected upon arrival at the Chem-Nuc1 car Systems, Inc., Barnwell, South Carolina disposal site.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of a review of the shipping papers, placarding and labeling requirements, radiation measurements, seicetive contamination surveys, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10. Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written applica-tion within twenty days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identi-fled in the application is contained in a separate'part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

I 8 0 0 4 2 0 0No i

L

6 Commonwealth Edison Company EB 2 21980 Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely,

[^

A. B. Davis, Chief Fuel Facility and Materials Safety Branch

Enclosure:

IE Inspection Report No. 15000039/79-07A cc w/ encl:

Donald E. Trull, Regional Administrator U.S. Dept of Transportation Lee !!cbbard, Site Manager Chem-Nuclear Systems, Inc.

Mr. D. L. Peoples, Director of Nuclear Licensing Mr. N. Kalivianakis, Plant Superintendent Mr. B. B. Stephenson, Station Superintendent hr. N. Wandke, Plant Superintendent Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Mr. Dean llansell, Office of Assistant Attorney General