ML19309C855

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1980
ML19309C855
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/02/1980
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19309C852 List:
References
NUDOCS 8004090320
Download: ML19309C855 (19)


Text

_ _ _ _ _

'e OPERATING DATA REPORT DOCKET NO. 50-333 DATE April 1980 C051PLETED BY E. Zu fel t TELEPilONE (3151342-3840 OPER ATING STATUS Fit 2Patriek Notes

1. Unit Name:
2. Reporting Period: 800301 - 800331
3. Licenwd 1hermal Power (SIWI). 2436
4. Nameplate Rating (Grow 51We): 883
5. Design Electrical Rating (Net 51We): 821
6. Stasimum Dependab!c Capacity (Gross S!We): 830
7. 51asimmn Dependable Capacity (Net 31We): 800
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Gise Reasons: .

None

9. Power Lesel To Which Restricted,If Any (Net 5tWe): None
10. Reasons For Restrictions,If Any:

This 51onth Yr..t o-Da t e Cumularise I1. Ilours in Reporting Period 744 2184 41017

12. Number Of flours Reactor Was Critical 744 2092.5 28722.7
13. Reactor Resene Shutdown llours 0 0 0
14. Ilours Generator On-Line 744 2052.5 27790.5
15. Unit Resene Shutdown flours 0 0 0
16. Grow T hermal Energy Generated (StWil) 1562616 4245168 55433362 17 Gross Electrical Energy Generated (51Wil) 538610 1461530 18815320
18. Net Electrical Energy Generated 151%II) 521005 1414405 18201980
19. Unit Senice Factor 100 *a 94.0% 67.8%
20. Unit Availahilit> Fac:or 100% 94.0% 67.8*6
21. Umt Capacity Factor (Using .\lDC Net) 8 7 . 5 *, 81.0's 61. 0*,
22. Unit Capacity Factor (Using DER Net) 85.3% 7 8 . 9?. 54.1%
23. Unit Forced Outage Rate O *s 6.0% 20.li
24. Shutdowns Scheduled Oser Nest 6 Stonths (1)pc. Date,and Duration of Each P Snubber inspection and refueling outage scheduled for Flay 1980
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in lest Status (Prior o Commercial Operation): Forecast Achiesed INil'IA L CRITICA LITY INilIA L ELECT RIC11Y CONISlERCI A L OPER ATION

)

8004090 31C

. . . ~ - . . - - . .-

.g AVERAGE DAll.Y UNIT POWER LEVEL i

DOCKETNOc 50-333 l UNIT . JAFNPP I

, - DATE April 1980 CO\lPLETED BY E. Zufelt TELEPilONE .[315)342-3840 MONT!! Elarch 1980

. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (M We-Net) .

IMWe Net) -

I g 751 37 745 2 750 gg 744 3 749 39 742

4 74 6 20 740 5 745 21 739 6 744 601 22 7

7I9 73I 23 g 570 779 28 9 712 25 706 4

10 747 26 471 l

.I I 502 27 607 12 523 710 28 13 590 775 29 I

I4 747 30 764 15 750' 3; 763 16 748

  • SUSDIARY: Unit operated at approximately 88% power during this reporting period. Two power reductions were performed on Flarch 7 and 22 for rod pattern changes and.two power reductions were performed on March 11 and 26 for condenser -

tube leak check and repairs. .

i i

d

i DOCKET NO. 50-333 UNIT SilOTDOWNS AND POWER REDUCTIONS JAFNPP UNIT N AME DATE April 1980 COMPLETED BY fj Zufelt REPORT MONTil March 1980 TELEPilONE (315)342-3840 '

1-4 "h .

. No. Date g

.3?

3g 3y hIi

,3 g 5 Licensee Event p Ew. h'.

c-8 V

Cause & Corrective Action to a

35 5 jdg Report a in U Prevent Recurrence 6

6 800308 S 0  !! 4 NA NA NA Power reduced for rod pattern change 7 800311 S 0 11 4 NA NA NA Condenser tube leaks with resulting high conductivity in reactor vessel 8 800322 S 0 11 4 NA NA NA Power reduced for rod pattern change 9 800322 S 0 11 4 NA NA NA Condenser tube Icaks with resulting high conductivity in reactor vessel i

I 2 3 4 F: Forted Reason: Method: Exhibit G Instructions

! S: Scheduled A Equipment Failure (Explain) 1-Manual for Prepasation of Data ll-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (1 ER) File (NUREG-D Regulatory Resitiction 4-Ot her (Explain) 0161)

E-Operator Training & License Examination F Administrative

  • 5 G-Opetational Leror (Explain) Eshibit I - Same Source Il-Oiher ( E xplain)

- - . - ~ ._. __

POWER AUTi!0RITY OF TIIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MARCil 1980 Unit operated at approximately 88% power for this reporting period. Power was reduced on March 7 and 22 for a rod pattern

, change. --

Two other power reductions occurred on March 11 and 26 due to condenser tube leaks with resulting high conductivity in the reactor vessel. Tube Icaks were repaired and power was increased at the pre-conditioning rate. ,

O i

I l

l i

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Maintenance Summary March 1980 I f, C Date System W rk Request # Cause of Results of Repair llow Detected Action taken to Component # Malfunction Malfunction Preclude Ture Recurrence (lfours) 07-6348 Went Inop while Performed cor-2/28/80 07 ,, gn gpgg OPS None performing S.T. rectly--No 4.0 problem 3/6/80 07 07-4273 IMP 7.6/7.22 OPS Unknown found o.k.-- 4.0

LPRM 36-05C Failed Ili ret'd. to service 3/6/80 07 07-6257 Adjusted gain LPIO! 28-2iD OPS Dirty Pot. Erratic ret'd. to service 2.0 3/6/80 07 07-6275 IMP 7.6/7.22 OPS Unknown found o . k . 4.0 LPIO!28-45D Failed Ili ret'd. to service 3/11/80 07 07-6364 IMP 7.6/7.22 OPS Age /Use Drifting Adjusted li.V, 4.0 LPRM 04-29D ret'd. to service 3/11/80 07

-4 OPS

, ,, N/A N/A 1.0 g

3/14/80 07 07-4300 IMP 7.6/7.22 LPRM 44-37C OPS Age /Use Drifting i found o.k. 18.0 ret'd. to service 3/14/80 07-6403 IMP 7.6/7.22 07 OPS Age /Use Drifting found o.k. 10.0 LPlot 36-05C ret'd.to service 07-5251 3/28/80 07 OPS Unknown Stopped prior to Increased TIP 3.0 g gp Core Top , purge 2

3/28/80 11 OPS N/A Check Setpoint ISP-82-1 18.0 y1 14-6278 -

Tested due to 3/1/80 14 IIC N/A N/A 14-DPIS-43A/B i test gauge out of cal ibra t mn Condensate pump Tested and found 15 0

_. 3/6/M@ 23 '.,

._'3-4135 , , , . . . I Ops Unknown wtutut u _

'{t l l: .l' l  ; . 1 I  : ,

e r ) 0 0 0 i e :.

arr piu 2 6 8 1

eTo R t t

-) (

Q: t o

s

/

r e e y n u g g a e ec u n l k d n a u e a ue G l R t l r P s t cr d t d neu e d c e or c c ea c i P e t R a nt gn a

l l c p i o p A e l C e e R A R d

e d e n e m f o oi e r n a z t l r s c s A e t n e t l u g t u uf u n py sl ea a g t a ma ol R  !

! s Cp T w n s l e o oi f

i C ND I

A P

R E

W n d o e O f i -

n y P y ot r c gs a R a en e i t l A m s u s l c e

r. uf U aa R E. u / t jf al e sn d '

S C  !

a g i o a

,N e  !

A Mc B c

. K n

C a I n R e 0 T t 8 d A n 9 e P i t Z a 1 c

T M e I h t F c e r D S S S

. a P P P A M w O O O o

S . i l

E t

D M

J ?i m

t B r s # 2 a e / l u t A 2 A q

e n 2 #

R n e 2 1 C

- /T sL 3 G 7 D o 4 W 3 N 5 E

  • k p 1 R 6 P 3 r m - - - - -

o o 0 0 6 P 3 C" WC 7 7 1 F 9 "

m 6 3 e 0 7

t 7 9 s

y S

4 G e 0 0

. t 8 0 8 a / 8 /

D 8 / 1 2 6 1

/ / /

3 3 3

POWER A'JI110RITY OF TIIE STATE OF NEW YORK '

JAMES A. FITZPATRICK NUCLEAR PONER PI).NT Safety Related Electrical 6 Mechanical Maintenance Su=ary REPAIR DATE WORK REQUEST

  • SYSTEM COMPONENT , if0W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 2 Feb 76 6277 Alarm Dust on ioni::ation smoke Renoved dust and reset alarm 2 SD-94 detector caused false alarm 20 Feb 10 2812 Visual NRC Bulletin 79-02 Modified !!10-14 1079 3/4 li10-14 Inspection 22 Feb 46 2858 Visual NRC Bulletin 79-02 Repaired 1146-18 1745 1146-18 Inspection 3742 NRC Bulletin 79-02 Repaired 1110-257 132 19 Feb 10 Visual 1110-257 Inspection NRC Bulletin 79-02 Repaired 1110-497 30S 25 Feb 10 377S Visual 1110-497 Inspection 3843 NRC Bulletin 79-02 Repaired BFSK-375 45 22 Feb 70 Visual BFSK-375 Inspection NRC Bulletin 79-02 Repaired BFSK-414 24 25 Feb 70 3820 Visual BFSK-414 Inspection NRC Bulletin 79-02 Modified 1113-42 55 25 Feb 13 3833 Visual 1113-42 Inspection NRC Bulletin 79-02 Repaired il46-267,tN 10 22 Feb 46 3852 Visual

!!46-267#tN Inspection NRC Bulletin 79-02 Repaired BFSK-410 24 21 Feb 70 5008 Visual BFSK-410 Inspection

.- c . .

POWER Alm!ORITY OF T!!E STATE OF NEW YORK JN!ES A. FITZPATRICK NUCLEAR POWER PLA.TT Safety Related Electrical 6 Mechanical Maintenance Sucaary WORK REQUEST , REPAIR DATE SYSTEM ii0W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT g Il0URS 21 Feb 10 5018 Visual NRC Bulletin 79-02 Repaired 1110-542 141

!!10-542 Inspection 21 Feb 01-125 5041 Visual NFC Bulletin 79-02 Repaired llanger B-2 17

!! anger B-2 Inspection 25 Feb 15 5073 Visual NRC Bulletin 79-02 Modified 1115-87 124

!!15-87 Inspection 27 Feb 17 6305 OPS Pump running excessively Replaced roots blower 6 PNL-04-13B hot Vent monitor '

6 25-Feb 27 6296 OPS Pump piston shaft broken Installed new pump 9 DW Gaseous Sample pump 12 Feb 66- 4367 Visual Filter pushed into housing Replaced filters 3 UC-22 26 Feb 70 3800 Visual NRC Bulletin 79-02 Repaired BFSK-580 30 BFSK-580 Inspection 26 Feb 19 3804 Visual NRC Bulletin 79-02 Repaired 1119-219 52

!!19-219 Inspection 22 Feb 66 3799 Visual NRC Bulletin 79-02 Repaired BFSK-379 55 BFSK-379 Inspection '

?6 Feb 46 3824 Visual NRC Bulletin 79-02 Repaired Detail "B" 53 3/4 Detail "B" Inspection ,

POWER AUTHORITY OF TIIE STATE OF NEW YORK ,

JAMES A. FIT 2 PATRICK NUCLEAR POWER PLAhT Safety Related Electrical 6 Mechanical Maintenance Sumary WORK REQUEST , REPAIR DATE SYSTEM 110W DETECTED CAUSE OF MALFUNCTION TIME COMPONENT 4 ACTION TAKEN TO PRECLUDE RECURRENCE 110URS 26 Feb 70 3831 Visual NRC Bulletin 79-02 Repaired BFSK-403 34 BFSK-403 Inspection 25 Feb 15 5037 Visual NRC Bulletin 79-02 Repaired 1115-101 160h 1110-101 Inspection 22 Feb 14 5033 Visual NRC Bulletin 79-02 Repaired 1114-17 26h 1114-17 Inspection 25 Feb 10 5030 Visual NRC Bulletin 79-02 Repaired 1110-546 33 3/4 1110-546 Inspection 14 Feb 19 5020 Visual NRC Bulletin 79-02 Repaired 1119-221 124 1119-221 Inspection 22 Feb 66 3792 Visual NRC Bulletin 79-02 Repaired BFSK-378 26 BFSK-378 Inspection 22 Feb 01-125 5042 Visual NRC Bulletin 79-02 Repaired llanger A 49 lianger A Inspection 27 Feb 10 3752 Visual NRC Bulletin 79-02 Repaired H10-259 48 1110-259 Inspection 27 Feb 10 3845 Visual NRC Bulletin 79-02 Repaired 1110-24 61h 1110-24 Inspection 27 Feb 46 5065 Visual NRC Bulletin 79-02 Repaired BFSK-405 24 BFSK-405 Inspection 27 Feb 23 5035 Visual NRC Bulletin 79-02 Repaired fi23-14A 33 If23-14A Inspection ,

POWER AlJTliORITY OF TIE STATE OF NEW YORK JASES A. FITZPATRICK NUCLEAR P0h'ER PLANT Safety Related Electrical S Mechanical Maintenance Summary REPAIR WORK REQUEST ,

DATE SYSTEM  !!OW DETECTED CAUSE OF MALFUNCTICN ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT ,

liOURS Repaired Il70-D 14 27 Feb 70 5032 Visual NRC Bulletin 79-02 1170-D Inspection NRC Bulletin 79-02 Repaired BFSK-402 94 27 Feb 70 3832 Visual BFSK-402 Inspection 3 Mar 76 6363 Alarn Dust on ioni ation smoke Removed dust and reset alarm 1 Zone 9 detector caused false alarn NRC Bulletin 79-02 Repaired 1146-6 80 28 Feb 46 3769 Visual 114 6 - 6 Inspection Repaired BFSK-378B 14 22-Feb 66 3815 '

Visual NRC Bulletin 79-02 BFSK-378B Inspection Repaired BFSK-559 16 28 Feb 70 3819 Visual NRC Bulletin 79-02 BFSK-559 Inspection NRC Bulletin 79-02 Repaired 1119-222 102 22 Feb 19 5046 Visual

!!19-222 Inspection i NRC Bulletin 79-20 Repaired 1110-471 219 28 Feb 10 2058 Visual fl10-4 71 Inspection Repaired 1146-137 2S 26 Feb 46 3738 Visual NRC Bulletin 79-02 1146-137 Inspection Repaired 1146-194 96 27 Feb 46 3757 Visual NRC Bulletin 79-02 i 1146-194 Inspection 9

e

POWER ALTniORITY OF TIIE STATE OF NEW YORK ,

JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 5 Mechanical Maintenance Su=ary REPAIR WORK REOUEST #

DATE SYSTEM if0W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMP 0 NEST ,

Il0URS 26 Feb 46 3759 Visual NRC Bulletin 79-02 Repaired 1146-193 39 1146-193 Inspection 29 Feb 46 3760 Visual NRC Bulletin 79-02 Repaired 1146-190 89 1146-190 Inspection 29 Feb 15 3777 Visual NRC Bulletin 79-02 Repaired fl15A-140 14 f f15 A-140 Inspection 27 Feb 10 3791 Visual NRC Bulletin 79-02 Repaired !!10-61 124 1110-61 Inspection 29 Feb 66 3793 Visual NRC Bulletin 79-02 Repaired 1166-9 52k 1166-9 Inspection 28 Feb 10 3809 Visual NRC Bulletin 79-02 Repaired 1110-51 B 45 1110-518 Inspection 29 Feb 66 3823 Visual NRC Bulletin 79-02 Repaired 1166-63 7 613

!!66-63 Inspection 28 Feb 10 3780 Visual NRC Bulletin 79-02 Repaired !!10-51 A 69k fl10-51A Inspection Failed SCR in Control Rm Replaced SCR's 8 10 Mar 70 3688 OPS S I.C- 101 heater temperature controller

! Mar 10 3737 Visual NRC Bulletin 79-02 Repaired PFSK-1354 925 PFSK-1354 Inspection

PONER AIJTliORITY OF Tl!E STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Su: mary I l WORK REQUEST , REPAIR DATE SYSTEM I!OW DETECTED CAUSE OF MALFU';CTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME COMPONENT ,

Il0URS 3 Mar 10 3745 Visual NRC Bulletin 79-02 Repaired 1110-10S 172h 1110-10s Inspection 4 Mar 46 3750 Visual NRC Bulletin 79-02 Repaired il46-1A 41 H46-1A Inspection 3 Mar 10 3776 Visual NRC Bulletin 79-02 Repaired 1110-31 22 1110-31 Inspection 4 Mar 10 3821 Visual NRC Bulletin 79-02 Repaired 1110-161 9S 1110-161 Inspection 28 Feb 66 3S39 Visual NRC Bulletin 79-02 Repaired H66-50 51 1166-50 Inspection 3 Mar 46 3846 Visual NRC Bulletin 79-02 Repaired 1146-170 145 1146-170 Inspection 28 Feb 23 5013 Visual NRC Bulletin 79-02 Repaired 1123-8 3 S'j 1123-8 Inspection 3 Mar 10 5031 Visual NRC Bulletin 79-02 Repaired 1110-548 102

}{10-548 Inspection 27 Feb 14 5034 Visual NRC Bulletin 79-02 Repaired 1114-15 75 1114 -15 Inspection

! Mar 15 5051 Visual NRC Bulletin 79-02 Repaired 1115-5 49'i 1115 - 5 Inspection 15 5078 Visual NRC Bulletin 79-02 Repaired. Anchor "A" 6 i Mar "

Anchor "A" Inspection

POWER Alml0RITY OF THE STATE OF NEW YORK

  • J/TES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Sumary REPA1R DRTE WORK REQUEST #

SYSTEM CO:&ONENT , HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS NRC Bulletin 79-02 Repaired 1110-177 114 A Sbr 10 50S1 Visual 1110-177 Inspection NRC Bulletin 79-02 Repaired 1110-467 89 10 Mar 10 2052 Visual H10-467 Inspection NRC Bulletin 79-02 Repaired 1110-516 141 6 Mar 10 2053 Visual H10-516 Inspection 2828 NRC Bulletin 79-02 Modified H10-152 526b 5 Mar 10 Visual 1110-152 Inspection NRC Bulletin 79-02 Repaired 1146-31 56 29 Feb 46 2856 Visual

~

H46-31 Inspection NRC Bulletin 79-02 Repaired 1115-165 73'i 4 Mar 15 3764 Visual 1115-165 Inspection Repaired 1119-29 28 7 Mar 19 3786 Visual NRC Bulletin 79-02 H19-29 Inspection  ;

Repaired 1115-321 49 4 Mar 15 3S02 Visual NRC Bulletin 79-02 1115-231 Inspection Repaired BFSK-319 3S 1 Mar 76 3810 Visual NRC Bulletin 79-02 BFSK-319 Inspection Visual NRC Bulletin 79-02 Repaired BFSK-579 535 u Mar 70 3828 BFSK-579 Inspection

POWER AtT1HORITY OF TifE STATE OF NEW YORK JAMES A. FIT 2 PATRICK NUCLEAR POWER PLAMT Safety Related Electrical 5 Mechanical Maintenance Summary WORK REQUEST , REPAIR DATy SYSTEM COMPONENT , if0W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME Il0URS 6 Mar 70 3841 Visual NRC Bulletin 79-02 Repaired BFSK-583 54 BFSK-583 Inspection 6 Mar 70 3855 Visual NRC Bulletin 79-02 Repaired BFSK-548 76 BFSK-548 Inspection 4 Mar 76 5058 Visual NRC Bulletin 79-02 Repaired 1176-36 307h 1176-36 Inspection 6lbr 15 5063 Visual NRC Bulletin 79-02 bbdified 1115-98 103 3/4 1115-98 Inspection 5061 NRC Bulletin 79-02 Repaired 1115-109 19 3 Mar 15 Visual 1115-109 Inspection 5022 NRC Bulletin 79-02 Repaired PFSK-1007 109 6 Mar 19 Visual PFSK-1007 Inspection 5 Mar 27 5036 Visual NRC Bulletin 79-02 Repaired 1127-1 3185 112 7 - 1 Inspection ,

1 5056 Visual NRC Bulletin 79-02 Repaired R.!!. #1 90 7 Mar 46 R.li. #1 Inspection NRC Bulletin 79-02 Repaired R.ll. #3 21 7 Mar 46 5057 Visual R.ll. #3 Inspection 5059 Visual NRC Bulletin 79-02 Repaired !!46-270- 302h 6 Mar 46 1146-270 Inspection t

.~

PONER AUTl!ORITY OF TIE STATE OF NEW YCRK .

JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Summary WORK REQUEST

  • REPAIR DATE- SYSTEM COMPONENT ,  !!ON DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME

!!OURS 4

3 Mar 11 5066 Visual NRC Bulletin 79-02 Repaired 1111-9 50'2 111 1 - 9 Inspection 4 Mar 11 5071 Visual NRC Bulletin 79-02 Repaired 1111-10 73 lill-10 Inspection 6 Mar 10 5076 Visual NRC Bulletin 79-02 Repaired 1110-130 32 3/4 1110-130 Inspection 6 Mar 10 5077 Vis'.al NRC Bulletin 79-02 Repaired 1110-451 39 1110-451 Inspection 4 Mar 10 5080 Visual  !' NRC Bulletin 79-02 Repaired 1110-219 59'2

!!!O-219 Inspection 11 Mar 14 2017 Visual NRC Bulletin 79-02 Repaired PFSK-873 56 PFSK-873 Inspection 11 Mar 76 2024 Visual NRC Bulletin 79-02 Repaired BFSK-658 (fil) 29 BFSK-658 (111 ) Inspection 10 Mar 10 3794 v naai F Rulletin 79-02 Repaired 1110-170 83 fl10-170 Inspect ' on 11 Mar 10 3795 Visual NRC Bu173 tin 79-02 Repaired 1110-155 29 1110-155 Inspect'on 11 Mar 15 3798 Visual NRC Bulletin 79-02 Repaired PFSK-1093 65 PFSK-1093 Inspection 11 Mar 76 3822 Visual NRC Bulletin 79-02 Repaired 1176-88 69 1176-83 Inspection

POWER AUT110RYTY OF TliE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR PCKER PLANT Safety Related Electrical S Mechanical Maintenance Su =ary WORK REQUEST e REPAIR DATE SYSTEM  !!0N DETECTED COMPONENT , CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liCURS 11 lbr 66 3S49 Visual NRC Bulletin 79-02 Repaired 1166-6 36 116 6 - 6 Inspection 10 Mar 76 3853 Visual NRC Bulletin 79-02 Repaired 1176-32 44 1176-32 Inspection 11 Mar 10 5040 Visual NkC Bulletin 79-02 Repaired 1110-602 47

!!10-602 Inspection 11 Mar 46 5055 Visual NRC Bulletin 79-02 Repaired R.ll. #2 6S R.!!. #2 Inspection 10 Mar 76 5068 Visual NRC Bulletin 79-02 Repaired 1176-40 10S'2 1176-40 Inspection 10 Mar 10 1935 Visual NRC Bulletin 79-02 Repaired !!!0-53A S S'2 il10-53A Inspection 6 Mar 76 3803 Visual NRC Bulletin 79-02 Repaired C-8 56 C-8 Inspection 12 Mar 67 3836 Visual NRC Bulletin 79-02 Repaired BFSK-638 38 BFSK-638 Inspection 12 Mar 67 5029 Visual NRC Bulletin 79-02 Repaired AZ-67-16 37 AZ-67-16 Inspection 11 Mar 19 5044 Visual NRC Bulletin 79-02 Repaired 1119-231 166'2 1119-231 Inspection

P0h?R AUT110RITY OF TIS STATE OF NEW YORK .

JAMES A. FITZPATRICK NUCLEAR POWER Pl. ANT .

Safety Related Electrical G Mechanical Maintenance Summary KORK REQUEST # REPA1R DATE SYSTEli COMPONENT #  !!ON DETECTED CAUSE OF !GLFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liCURS 14 Mar 15 5062 Visual NRC Bulletin 79-02 Repaired 1115-147 47 1115-147 Inspection 12' Mar 76 5067 Visuai NRC Bulletin 79-02 Repaired BFSK-654 189 BFSK-654 Inspection 12 Mar 76 3826 Visual NRC Bulletin 79-02 Repaired 1176-72 9 512 1176-72 Inspection 17 bbr 66 5010 Visual NRC Bulletin 79-02 Repaired BFSK-468 8 BFSK-468 ,

Inspection 5 Mar 66 5014 Visual NRC Bulletin 79-02 Repaired BFSK-446E 86\

BFSK-446E Inspection 5 Mar. 66 5024 Visual NRC Bulletin 79-02 Repaired BFSK-446F 61 BFSK-446F Inspection 14 Mar 19 5043 Visual NRC Bulletin 79-02 Repaired !!!9-121 164 1119-121 Inspection 15 Mar 46 5094 Visual NRC Bulletin 79-02 Repaired 1146-335 ISS 1146-335 Inspeetion 17 Mar 10 2877 Visual NRC Bulletin 79-02 Repaired fl10-86A 141 3/4 il10-86A Inspection 13 Mar 10 3817 Visual NRC Bulletin 79-02 Repaired 1110-82 98 h 1110-82 Inspection 14 Mar 66 3848 Visual NRC Bulletin 79-02 Repaired 1166-4 76h 116 6 - 4 Inspection

POWER AITTl!ORfTY OF TIE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT Safety Related Electrical 6 Mechanical Maintenance Su:x:ary WORK REQUEST , REPAIR DATE SYSTEM CO"PONENT y  !!CW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 18 Mar 66 5004 Visual NRC Bulletin 79-02 Modified 1166-47 362 H66-47 Inspection 17 Mar 15 5069 Visual NRC Bulletin 79-02 Modified 1115-151 197 H15-151 Inspection 18 Mar 23 5070 Visual NRC Bulletin 79-02 Repaired 1123-16 11 1123-16 Inspection 12 Mar 11 5072 Visual NRC Bulletin 79-02 Repaired Sketch 1 152 Sketch 1 Inspection 15 5085 Visual NRC Bulletin 79-02 Repaired 1115-154 97 38 Mar 1115-154 Inspection 17 Mar 10 2054 Visual NRC Bulletin 79-02 Repaired il10A-47 -

ISh li10A-4 7 Inspection 18 Mar 66 3814 Visual NRC Bulletin 79-02 Repaired !!66-86 53 1166-86 Inspection 3816 NRC Bulletin 79-02 Repaired 1115-319 19 18 Mar 15 Visual 1115-319 Inspection 3830 NRC Bulletin 79-02 Repaired 1115-310 S0 18 Mar 15 Visual 1115-310 Inspection 3835 NRC Bulletin 79-02 Repaired llanger "A" 50 17 Mar 67 Visual llanger "A" Inspection 17 Meir 66 3847 Visual NRC Bulletin 79-02 Repaired !!66-1 40 3/4 ,

116 6 - 1 Inspection ,

e

_ _ _ _ , _ . , _ _ , = _ _ _ _ _

PCNER AUT110RITY OF TIE STATE OF NEW YORK -

JAMES A. FIT 2 PATRICK NUCLEAR PCWER PLA';T

  • Safety Related Electrical 5 Mechanical Maintenance Summary WORK REQUEST = REPAIR DATE I SYSTEM COMPONE!h 7 liOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME liOURS 19 Mar 10 3842 Visual NRC Bulletin 79-02 Repaired 1:10-389 125b 111 0 - 3 S 9 Inspection 18 Mar 10 3851 Visual NRC Bulletin 79-02 Repaired 1110-452 29 1110-452 Inspection 17 Mar 14 3857 Visual NRC Bulletin 79-02 Repaired !!14-51 79 1114-51 Inspection 19 Mar 76 5016 Visual NRC Bulletin 79-02 Repaired BFSK-65S (113) 22 BFSK-658 (113) Inspection 25 Mar 11 4S42 N/A None Extended suction piping heat tracing 8 Ileat trace to include common relief valve discharge line 20 Mar 76 2845 Visual NRC Bulletin 79-02 Modified 1176-61 322 3/4 H76-61 Inspection 6 Mar 10 5039 Visual NRC Bulletin 79-02 Repaired 1110-133 86 1110-133 Inspection 18 Mar 76 5064 Visual NRC Bulletin 79-02 Repaired BFSK-658 (112) 27 BFSK-658 (112) Inspection 17 Mar 10 3773 Visual NRC Bulletin 79-02 Repaired 1110-176 231 3/4

!!10-176 Inspection