Summary of 800314 Meeting W/Utils,Westinghouse & Sargent & Lundy Re Westinghouse Optimized Fuel Assembly.Comm Ed Requested to Amend FSAR as Soon as Possible to Show Plant Will Use Optimized Fuel Assembly
ML19309C687
Person / Time
Site: Catawba, Byron  Duke Energy icon.png
Issue date: 03/18/1980
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8004090155
Download: ML19309C687 (8)


Text

v k

MEETING

SUMMARY

DISTRIBUTION LWR-1 Docket File 50-413 Docket File '50-454 NRC Participants NRC PDR Appropriate IE Regional Offices Local PDR T. Novak TIC L. Phillips NRR Reading R. BosnaK LWR 1 File H. Denton E. G. Case H. Berkow D. Ross D. Vassallo J. Stolz R. Baer Caseload Forecast Panel Meetings Only O. Parr L. Rubenstein J. Rothfleisch S. Varga T. Abell C. Heltemes G. Matthews L. Crocker W. Lovelace B. Kirschner S. Boyd F. Williams H. Berkow R. Mattson L. Schaub R. DeYoung Trip Participants Project Manager Attorney, ELD E. Hylton IE (3)

' ACRS (16)

R. Denise t

L F

8 0 0 4 0 9 0g66

f **Guq'O,h 0

UNITED STATES

+

8y,e NUCLEAR REGULATORY COMMISSION 1

C WASHINGTON, D. C. 20555 1

f g

M 1 8 1990 Topical Report File VENDOR: Westinghouse Electric Corporation

SUBJECT:

SUMf1ARY OF MARCH 14, 1980 MEETING REGARDING REVIEW 0F OPTIMIZED FUEL ASSEMBLY Representatives of Westinghouse and utilities met with NRC staff to present and discuss plans for incorporating the Westinghouse 17 x 17 optimized fuel assembly design into applications for operating licenses.

The Duke Power Company application for the Catawba plant (Docket No. 50-413) and the Comonwealth Edison Company application for the Byron-1 plant (Docket No.

50-454) will use the Westinghouse optimized fuel design. is a list of attendees at this meeting. provides a copy of Westinghouse slides used in this meeting.

Slide 1 identifies topical reports that describe safety analysis and tests of the 17 x 17 optimized fuel assemblies (WCAP-9500 and WCAP-9401) and some related reports. WCAP-8278, " Hydraulic Flow Test of the 17 x 17 Fuel Assembly" has been accepted on the condition that tests of the assembly in the Trojan reactor are acceptable.

Staff plans to complete its review of Trojan tests by the end of March 1980.

Westinghouse said the analysis of fuel rod fretting wear in WCAP-8647 is not needed to support its con-clusion that the optimized fuel assembly is acceptable and therefore Westinghouse will request its withdrawal from the NRC Topical Report Review.

Program. WCAP-9285, " Optimized Fuel Assembly Demonstration Program" describes tests of assemblies in operating reactors and provides a safety analysis in accord with 10 CFR 50.59 to show that these tests will not cause a safety problem in the operation of the reactors; therefore, WCAP-9285 is not being reviewed as a part of the optimized fuel assembly safety review.

The bottom half of Slide 2 shows the Westinghouse proposed schedule for review of the first application to incorporate the optimized fuel assembly into its FSAR (Byron-1).

The schedules for review of the topical reports are those provided to Westinghouse by J. Stolz letters dated August 23,1979 and September 18, 1979.

If the topical report reviews are completed as scheduled on December 1,1980, there will be 3 months available for review of plant specific information in the FSAR for inclusion in the Byron-1 SER.

I

gg i g gp Slide 4 provides the Westinghouse view of the status of the review by NRC branches and dates for meetings expected to occur within the next month.

Staff agrees with this summary of the status and future meetings.

It is noted that the review is about one month behind schedule.

I Staff requested that Commonwealth Edison amend the Byron /Braidwood FSAR as soon as possible to show that Byron-1 will use the Westinghouse optimized 1

fuel assembly.

This could be done by referencing WCAP-9500 and WCAP-9401 in Section 1 of the FSAR.

An FSAR amendment to replace Sections 4 and 15 by WCAP-9500 can be left till the end of this year, as indicated in Slide 2.

However, referencing of WCAP-9500 now will officially advise reviewers and parties to the hearing of the planned substitution, so that they will not waste manpower reviewing sections that are to be replaced.

It is not necessary to amend the Catawba-1 FSAR now since it has only been tendered and is not yet docketed for review.

v p

w

,tsb L. C. Kintner, Project Manager Light Water Reactors Branch No.1 Division of Project Management

Enclosures:

1 As stated l

I

ENCLOSURE 1 WESTIf1GHOUSE - NRC MEETING OPTIMIZED FUEL ASSEMBLY MARCH 14, 1980 ATTENDEES DUKE WESTINGHOUSE NRC SARGENT & LUNDY G. Snipes A. Ball, Jr.

L. Kintner E. Crass W. H. Rasin J. Guthridge J. Stolz S. Davidson C. Moon M. Oper D. Hood G. Fidler D. Houston M. Dunenfeld R. Martin COMMONWEALTH EDISON R. Kelm l

k ELEMS CF 17 x 17 OPTIMIZED FUEL LICBGItG hrAP-9500, "REFEPBiCE COPE FEPORT - 17 x U OPTIMIZED FUEL ASSB2LY" brAP-9401., "VERIFICATICf! TESTING AND AfMLYSES - F x 17 OPTIMIZED FUEL ASSE?LY" hrAP-8278, "hEFAULIC FLCil TEST CF THE 17 x 17 FUEL ASSBELY" h' CAP-E545, "A"ALYSIS C? FUEL RCD FF iiI::3 ',5.R" WCAP-9285, "0PTIMId.9 FUEL ASSBILY EEUSTPATIO:' FRCGP#1" iHDPROGP#1 i

I 1

SLIDE 1

FUEL LICEllSifjG - KEY llll EST0flE Sut!!!ARY 1st FSAR Anend 1st SER lst FLD

.2ndard 17X17 Fuel

/ - _6_. _ - - - - - - 4 (0/7 (10/74)

(11/75)

Submit Approval WCAP-8185 WCAP-3185 A_ __ _ _ _ _ _ _ _n (8/73)

(7/74) 1st Demo (1) Cycle (2) Cycles L __ __.__ _ _ __ __ __ ___A 3

(Fall '74)

L: Submittal of Test Topicals -b-Review Continuing (2/74)

(5/75)

I I

I I

I I

l l

I I

I I

I I

I i

l 1972 1973 1974 1975 1976 8

E lst FSA8 G

Amend 1st SER lst FLD

,i.timized 17X17 Fuel A" - d'~ ~~

--d Submit (11/1/30)

(3/1/81)

(1/

0-1 SER (WCAP-9500) 11 CAP _9500A_ _ __ __ __

_3-_,Qg-2._. _ _ _ A (7/30/79)

SER (llEAP-8278)

_ _ _a (12/31/79)

Q-1 Q-2 SER (llCAP-8646)

_ _ _i_ _ A.

6/30/80)

Submit ilCAP-9401 Q-1 0-2 SER (llCAP-9401)

A _ _ _ _. __ _ _A_ _A_ _A Submit IlC P-9285 1s Demo (1) ycle (2) ycles (3) cles (8/78)

(11/79) e i

I 1,,,

I t

[ __,, i t

i 1

I i

i l

I l

A 1

le 11ril 1 0'17

3/14/80 STATUS OF ESTliEEOUSE CPTlMlZED FUEL GEIERIC FEVIEW NRC REVIBI SCHEEULE Cl G

C WCAP-9500 )

WCAP-8278 )

WCAP-8646(2)WCAP-9401 ISSUE 0-l's 3/1/80 N.A.

2/15/80 2/15/80 RESPONSETO0-l's 5/1/80 N.A.

361/80 35V80 ISSUE 0-2's 7/1/80 N.A.

460/80 460/80 ESPONSE TO 0-2's 9/1/80 N.A.

56V80 56V80 ISSUESER 12/V80 12SV79 660/80 660/80 (1)

STOLZ TO ANDERS0il LETTER DATED 8/23/79 PELATIE TO WCAP-9500, "PEFERENCE CORE REFORT FOR 17x17 CPTIEIZED FUEL",

(2)

STOLZ TO RTEf!ECM LtiitR El,TE 9/18/79 PELATIVE T0:

hCAP-8278, "hYERAULIC FLG! TEST CF THE 17x17 FLEL ASSEILY" WCAP-8646, " ANALYSIS OF REL R0D FPETTIIS VEAR" WCAP-9401, " VERIFICATION TESTifE AND ANALYSIS - 17x17 OPflMIZED FUEL ASSE2LY",

SLIDE 3

3/14/E0 CPTlMIZED FUEL REVlB1 STATUS EACTOR SYSUS BPANCH e

REVIEW CURRafiLY IS C00RDItaTED BY L.' LOIS OF DRt AINANCED REACTOR BRANCHWITHARCGiNEIMTI0t'LLABSUPPORT A

e 3/7 NRC/ WESTINGHOUSE /ARCGiNE RETItE TO DISCUSS PRELIMItARY SET OF 0-l'sONWCAP-9500ANDWCAP-9401 e

F0PPAL Q-l's EXPECTED BY 4/7/80 e

REVIBi PESFONSIBILITY WILL THEN BE TPANSFERRED BACK TO NOWAL BPANCH

PURVIBl, NTLYSISEP.CCH e

PRELIMItRRY 0-l's DFAFTED EUT NOT YET DISCUSSED WITH TESTIfEHOUSE e

FL'RDiER ACTIC: FEI!!S iAI CO:,T?!CT EC-/EE0D (liiilEi.T) e REVIBI EETIIS EXFECTED BY MID-APRIL, COPE PERF0FANCE BRAtCH e

FUEL SECTI0tl DRAFT 0-l's EEING PPEPARED -

kESTItEHOUSE/URC (FL5L SECTI0tl) htiIPE SCHEDULE FOR 4/14/8 e

e hESTIlEHOUSE/f!RC (COPE PHYSICS) EETING SCHEDULED FOR 4/2/80.

9

.