ML19309C659
| ML19309C659 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck, Millstone File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 02/08/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML19309C660 | List: |
| References | |
| NUDOCS 8004090131 | |
| Download: ML19309C659 (2) | |
See also: IR 05000213/1979020
Text
t>
-
jaug
ff#
.
[g
'g
UNITED STATES
g
NUCLEAR REGULATORY COMMISSION
t
J
REGION 1
0.,
7
631 PARK AVENUE
4
$
,$
KING OF PRUSSIA, PENNSYLVANIA 19406
9
Docket Nos. 50-213
50-245
FEU
8 1980
50-336
Connecticut Yankee Atomic Power Company
Northeast Nuclear Energy Company
ATTN:
Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection Nos. 50-213/79-20, 50-245/79-26, and 50-336/79-28
This refers to the inspection conducted by Mr. G. Napuda of this office on
November 27-30 and December 3-7, 1979, at the Haddam Neck Plant, Haddam,
Connecticut; Millstone Nuclear Power Station, Units 1 and 2, Waterford,
Connecticut; and your Berlin, Connecticut, corporate offices of activities
authorized by NRC License Nos. DPR-61, DPR-21, and DPR-65 and to the discus-
sions of our findings held by Mr. G. Napuda with yourself, Messrs. W. Fee and
G. Johnson and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you had taken to correct the item of non-
compliance brought to your attention in a letter dated January 17, 1979 (Haddam
Neck Plant).
We have no further questions regarding your action at this time.
'
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
'f this
.
report contains any information that you (or your contractor) believ's to be
proprietary, it is necessary that you make a written application wichin 20 days
to this office to withhold such information from public disclosure.
Any such
application must be accompanied by an affidavit executed by t:ie owner of the
information, which identifies the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
000 4 090ly
_
,
.
.
.
.
Ccnn:cticut Yank *.e Atomic Power
Northeast Nuclear Energy Company
Company
2
FEB
8 1980
which will be considered by the Commission as listed in subparagraph (b) (4) of
Section 2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
I+'ve do not hear from
you in this regard within the specified period, the report will be placed in
'
the Public Document Room.
No reply to this letter is required; however, if you should have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
A
!
El o
J. Brunner, Chief
Rea tor Operations and Nuclear
Support Branch
Enclosure:
Office of Inspection and Enforcement
Combined Inspection Report Numbers
50-213/79-20, 50-245/79-26 and
50-336/79-28
cc w/ encl
R. Graves. Plant Superintendent
John Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance