Forwards IE Insp Repts 50-213/79-20,50-245/79-26 & 50-336/79-28 on 791127-30 & 1203-07.No Noncompliance Noted
ML19309C659
Person / Time
Site: Haddam Neck, Millstone  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/08/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19309C660 List:
References
NUDOCS 8004090131
Download: ML19309C659 (2)


See also: IR 05000213/1979020

Text

t>

-

jaug

ff#

.

[g

'g

UNITED STATES

g

NUCLEAR REGULATORY COMMISSION

t

J

REGION 1

0.,

7

631 PARK AVENUE

4

$

,$

KING OF PRUSSIA, PENNSYLVANIA 19406

9

Docket Nos. 50-213

50-245

FEU

8 1980

50-336

Connecticut Yankee Atomic Power Company

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection Nos. 50-213/79-20, 50-245/79-26, and 50-336/79-28

This refers to the inspection conducted by Mr. G. Napuda of this office on

November 27-30 and December 3-7, 1979, at the Haddam Neck Plant, Haddam,

Connecticut; Millstone Nuclear Power Station, Units 1 and 2, Waterford,

Connecticut; and your Berlin, Connecticut, corporate offices of activities

authorized by NRC License Nos. DPR-61, DPR-21, and DPR-65 and to the discus-

sions of our findings held by Mr. G. Napuda with yourself, Messrs. W. Fee and

G. Johnson and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you had taken to correct the item of non-

compliance brought to your attention in a letter dated January 17, 1979 (Haddam

Neck Plant).

We have no further questions regarding your action at this time.

'

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

'f this

.

report contains any information that you (or your contractor) believ's to be

proprietary, it is necessary that you make a written application wichin 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by t:ie owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

000 4 090ly

_

,

.

.

.

.

Ccnn:cticut Yank *.e Atomic Power

Northeast Nuclear Energy Company

Company

2

FEB

8 1980

which will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

I+'ve do not hear from

you in this regard within the specified period, the report will be placed in

'

the Public Document Room.

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

A

!

El o

J. Brunner, Chief

Rea tor Operations and Nuclear

Support Branch

Enclosure:

Office of Inspection and Enforcement

Combined Inspection Report Numbers

50-213/79-20, 50-245/79-26 and

50-336/79-28

cc w/ encl

R. Graves. Plant Superintendent

John Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer