ML19309C588

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-321/80-01 & 50-366/80-01.Corrective Actions:Data Sheet Revised to Relocate Fire Pump Fuel Level Checks & Assignment Sheet Revised to Use HNP-2-9503
ML19309C588
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/10/1980
From: Widner W
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309C587 List:
References
NUDOCS 8004090035
Download: ML19309C588 (1)


Text

_

,~..

G:orgia Pow r Comp:ny p

230 Prachtree Strret Post Offico Box 4545 j

Atlanta, Georgia 30302 Telephone 404 522-6060 h

Power Generation Department March 10, 1980 Georgia Power neamas uc sg y

" :n U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement

REFERENCE:

C

~

Region II - Suite 3100 RII: BTM 101 Marietta Street, NW 50-321/80-01 W

C Atlanta, Georgia 30303 50-366/80-01

/

ATTENTION:

Mr. James P. O'Reilly Gentlemen:

The following is offered as a response to the NRC Inspection Report Numbers 50-321/80-01 and 50-366/80-01 concerning item of noncompliance 321/80-01-02, 366/80-01-02; deficiency:

321/80-01-02 HNP-1-3351-E, Fire P' ump Test e

Data Sheet 1 of HNP-1-3351-E was revised on 1-18-80 to relocate the requirement for fire pump fuel tank level checks on the data sheet as " System Restoration" Step J.3.

This step requires fuel tank level checks for both diesel fire pumps and a " sign off" for each level check. Relocation of this requirement on the data sheet will prevent future problems.

Full compliance has been achieved.

366/80-01-02 HNP-831, Technical Specification Surveillance Program e

The assignment sheet specified in HNP-831 has been revised to assign the use of procedure HNP-2-9503 instead of HNP-2-9203 to comply with Technical Specifications 4.3.6.6.

The latest revision to HNP-2-9503 includes the frequency requirement and a data sheet.

Similar changes have also been completed on Hatch 1.

This corrective action will prevent future occurrences.

If there are any further questions in this regard, please contact this office.

Very truly yours, WW &:

=

W. A. Widner Vice President and General Manager Nuclear Generation RDB/mb

{

800409063 5 OMICIAL CSPY