ML19309C066
| ML19309C066 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 02/25/1980 |
| From: | Bryant J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML19309C067 | List: |
| References | |
| NUDOCS 8004080122 | |
| Download: ML19309C066 (2) | |
See also: IR 05000338/1980008
Text
,
- - - - - - - - - - - - - - - - - - - - - - _
~
-
)
< /c
/
'o,,
UNITED STATES
M"858
NUCLEAR REGULATORY COMMISSION
359
r
e
REGION 11
o
101 MARBETTA ST
N.W., SulTE 3100
,
ATLANTA. GEORGIA 30303
{
FEB 2 51980
l
In Reply Refer To:
RII:RMC
50-338/80-8
50-339/80-6
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
l
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
.
This refers to the inspection conducted by R. M. Compton of this office on
February 6-8, 1980, of activities authorized by NRC License No. NPF-4 and
Construction Permit No. CPPR-78 for the North Anna facility, and to the
discussion of our findings held with P. G. Perry at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Roor.
-
e
- - - -
_
_
_ _ _ _
- .
.
J
Virginia Electric and Power
-2-
Company
FEB 2 51980
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
&
. C. Bry nt, Acting Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
,
Inspection Report Nos. 50-338/80-8
and 50-339/80-6
cc w/ encl:
W. R. Cartwright, Station Manager
Box 402
Mineral, VA 23117
P. G. Perry
Senior Resident Engineer
P. O. Box 38
Mineral, VA 23117
,
,.
N
e
T