ML19309B914

From kanterella
Jump to navigation Jump to search
Forwards LER 80-034/03L-0
Date released: 11/19/2019 Download: ML19309B914


LER 80-034/03L-0:on 800307,while Performing Visual Insp of Accessible Snubbers,Snubbers 2G41-1SS22,2SW-175SS166 & 2E41-2SS105 Found Inoperable.Caused by Pipe Clamp Slippage, Missing Locking Pin & Leaking Shaft Seal,Respectively
ML19309B918
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/04/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309B918 (2)
Forwards LER 80-034/03L-0
ML19309B913
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/04/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309B913 (1)