Forwards IE Insp Rept 50-373/80-01 on 800109-11 & 15.No Noncomplianace Noted
ML19309B780
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 02/07/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed L
COMMONWEALTH EDISON CO.
Shared Package
ML19309B781 List:
References
NUDOCS 8004070172
Download: ML19309B780 (2)


See also: IR 05000373/1980001

Text

/

'

UNITED STATES

!"

'n

NUCLEAR RESULATORY COMMISSION

d

E

REGION lil

y#

6

o

790 ROOSEVELT ROAD

GLEN ELLYN, ILLINOIS 6o137

. . . . . ,e

FEB

7 1980

Docket No. 50-373

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. D. E. Miller of this office

on January 9-11 and 15, 1980, of activities at LaSalle County Nuclear

Station, Unit I authorized by NRC Construction Permit No. CPPR-99 and to

the discussion of our findings with Mr. Diederich and others at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined dur-

ing the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Based on discussions with your representatives at the site, we understand

that you will perform an engineering review of the station vent sampling

piping to identify potential particulate traps upstream of the particulate

sampler, and will make any necessary alterations to the piping to climinate

such traps that exist.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the en-

closed inspection report will be placed in the NRC's Public Document Room,

except as follows.

If this report contains information that you or your

contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The application must include

a full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

)

identified in the application is contained in an enclosure to the applica-

tion.

B004 070 N k

-

. _ _ -

__

_ _ _ _ _ _ _ _ _ _ _ _ _

.

' Commonwealth-Edison

-2-

FEB

7issa

. _ ,

' Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerel ,

A. B. Davis, Chief

Fuel Facility and

Materials Safety Branch

Enclosure:

IE Inspection

Report No. 50-373/80-01

cc w/ enc 1:

Mr. D. L. Peoples, Director

of Nuclear Licensing

Mr. L. J. Burke, Site

Project Superintendent

Mr..T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

-Superintendent

Central Files.

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

I

l

!.

b[

._