Text
'-
- . -
.* /,)/
o ner
o
UNITED STATES
8
g
NUCLEAR REGULATORY COMMISSION
.
o
$
uE
REGION 11
f
101 MARIETTA ST
N.W., SulTE 3100
o
b
ATLAf4TA, GEORGIA 30303
%*****o
JAN 2 31980
In Reply Refer To:
RII:JJL
50-424/79-19
50-425/79-19
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by J. J. Lenahan of this office on
December 27, 1979 of ac'..vities authorized by NRC Construction Permit Nos.
CPPR-108 and CPPR-109 for the Vogtle facility, and to the discussion of our
findings held with H. H. Gregory, III at the conclusion of the inspection.
'
Areas examined during the inspection and our findings are discussed in the
enclosed inspect' ion report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprieta ry, and should be prepared so that proprieta ry
information identified in the application is contained in a separate part of the
document. If we do not hear from you in t'as regard within the specified period,
,
'
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
J. C. Br ant, Acting Chief
Reactar Construction and Engineering
Support Branch
Enclosure: See Page 2
LLn M
8004040 j(.A
c-
,-
,
.
Georgia Power Company
-2-
JAN 2 31960
Enclosure:
Inspection Report Nos. 50-424/79-19
and 50-425/79-19
cc w/ enc 1:
K. M. Gillespie
Construction Project Manager
P. O. Box 282
Waynesboro, GA 30830
E. D. Groover
QA Site Supervisor
P. O. Box 282
Waynesboro, GA 30830
,
D. E. Dutton
Project General Manager
Georgia Power Company
Post Office Box 4545'
Atlanta, Georgia 30303
.
l
i
l
[
i
_ . .