Forwards IE Insp Repts 50-500/80-01 & 50-501/80-01 on 800206.No Noncompliance Noted
ML19309B437
Person / Time
Site: Davis Besse  Cleveland Electric icon.png
Issue date: 02/29/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19309B438 List:
References
NUDOCS 8004040145
Download: ML19309B437 (2)


See also: IR 05000500/1980001

Text

a e

s ur

[

UNITED STATES

[/C

g

,,

g

NUCLEAR REGULATORY COMMISSION

'

L

r

REGION ill

.*

$

8

7tB ROOSEVELT ROAD

E

%,

.....f

GLEN ELLYN. ILLINolS 60137

FEB 2 91980

Docket No. 50-500

Docket No. 50-501

Toledo Edison Company

ATTN:

Mr. Lowell E. Roe

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the special inspection conducted by Messrs. C. E. Jones

and W. B. Grant of this office on February 6, 1980, of the Davis-Besse

2-3 construction site in terms of LWA activities undertaken and action,

if any, to return the site to pre-LWA conditions, and to the discussion

of our findings with Mr. Eichenauer and other members of your staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection and the status of construction activity concern-

ing the LWAs. Within these areas, the inspection consisted of a tour

of the site and observations of site features.

No deviations from commitments which you have made in the LWAs were

identified during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

i

,

8 004 04 0l$$

,.

Toledo Edison Company

-2-

fd 20

.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

,.<22lN W

,

aston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Rpt No. 50-500/80-01

.and No. 50-501/80-01

cc w/ encl:

Central Files

'

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio Power

Siting Commission

Helen W. Evans , Director,

Division of Power

Generation

.

, . , , . -

. . , .