ML19309B332

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-341/80-01 on 800115-18.No Noncompliance Noted
ML19309B332
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/16/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19309B333 List:
References
NUDOCS 8004040050
Download: ML19309B332 (2)


See also: IR 05000341/1980001

Text

  • '

[*

) , N

NUCLEAR REGULATORY COMMISSION

IIC

o

UNITED STATES

,

$

$

REGION lil

"

b[

799 ROOSEVELT ROAD

,

o,

% '...* o

GLEN ELLYN. ILLINOIS 60137

FEB 161980

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the inspection conducted by Messrs. F. J. Jablonski,

J. Hughes, and P. A. Barrett of this office on January 15-18, 1980, of

activities at Enrico Fermi Nuclear Station, Unit 2, authorized by NRC

Construction Permit No. CPPR-87 and to the discussion of our findings

with you and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Secti

. 790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that uroprietary inform-

ation identified in the application is contained in an enclosure to the

ab 1ication.

8:0e404 o o554

,

.

-

-

. -..

,

..

FEB 16 E60

The Detroit Edison Company

-2-

.

We will gladly discuss any questions you have concerning this

.

inspection.

Sincerely,

-

M 'Yb

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-341/80-01

i

cc w/ enc 1:

Central Files

]

Reproduction Unit NRC 20b

f

PDR

4

Local PDR

.

NSIC

TIC

Ronald Callen, Michigan Public

1

Service Commission

Eugene B. Thomas, Jr.,

Attorney

.

I

I

1-

4

l

,

l

.

,

-

.

, . - . _

__.-,g,.

, . . , , .

,,

,,--,.y..

.

,,-e,9