ML19309B205
Jump to navigation
Jump to search
| ML19309B205 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/10/1980 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8004030271 | |
| Download: ML19309B205 (2) | |
Text
l]8C. ~-lYdrO
- fM9ho, (g"Coqjo UNITED STATES g
g' g
NUCLEAR REGULATORY COMMISSION C
W ASHINGTON, D. C. 20555 t
8 March 10,1980 Docket Nos.
50-250 and 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, F1orida 33152
Dear Dr. Uhrig:
We have completed a review of your Safeguards Contingency Plan for the Turkey Point Plant. The enclosed comments indicate the need for additional information.
Please respond to our comments with the requested information within 30 days of the receipt of this letter.
Sincerely, p
- fn fff$
A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors
Enclosure:
As stated Attach =ent to be 7.ithheld from Public Disclosure Ccatains 10 ca.Ned 8004 Osop j
,