Responds to to President Carter Expressing Concern Over Moratorium on Issuance of CPs & Ols.Discusses Transition Period During Implementation of Kemeny Commission Recommendations Re TMI Investigation.Doe 800122 Memo Encl
ML19309B091
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/03/1980
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Megow L
AFFILIATION NOT ASSIGNED
Shared Package
ML19309B092 List:
References
NUDOCS 8004030052
Download: ML19309B091 (2)


Text

a g c.

P D A a atooq'o UNITED STATES

+

[ } 3 v.4 3 NUCLEAR REGULATORY COMMISSION

';;.{f o) a

.. E WASHINGTON, O. C. 20555 o, '

MAR 03;cgg s.

Mr. L. F. Megow Senior Vice President, Sales Hahn & Clay Machine and Boiler Works 5100 Clinton Drive Houston, Texas 77020

Dear Mr. Megow:

This is in reply to your letter of November 28, 1979, to President Carter, which was referred to the Nuclear Regulatory Commission by the Department of Energy on January 22, 1980.

A state =ent by President Carter on December 7, 1979, about the Report of the President's Commission on the Accident at Three Mile Island (the Kemeny Commission) included the following:

" Finally, I would like to discuss how we manage the transition period during which the Kemeny recommendations are being implemented. There are a number of new nuclear plants now awaiting operating licenses or construction permits.

" Licensing decisions rest with the NRC and, as the Kemeny Commission noted, it has the authority to proceed with licensing these plants on a case-by-case basis, which may be used as circumstances surrounding a plant dictate. The NRC has indicated, however, that it will pause in issuing new licenses and construction permits in order to devote its full attention to putting its house in order.

I endorse the approach the NRC has adopted, but I urge the NRC to complete its work as quickly as possible, and in any event no later than six months from today.

"Once we have instituted the necessary reforms to assure safety, we cust resume the licensing process promptly so that the new plants which we need to reduce our dependence on foreign oil can be built and cperated."

The Nuclear Regulatory Co= mission is committed to protect the public health and safety. The Three Mile Island accident resulted in a need for changes in the approach to safety. The Nuclear Regulatory Co= mission has found that actions recommended by its own staff and by the President's Co= mission on the Accident at Three Mile Island in the areas of hu=an factors, operational safety, emergency planning, nuclear power plant design and siting, health effects, and public information are necessary and feasible.

s At this time we are preparing for review and approval by the Nuclear Regula-l tory Commission an Action Plan that will specify the precise actions to be i

l

A Mr. L. F. Megow }:!AR 0 3 jeSO taken.

It will include new or improved safety objectives, detailed criteria for their implementation, and various implementation deadlines. As soon as the Action Plan is completed and approved, the resulting regulatory require-ments will be transmitted to all utilities concerned.

It is recognized that there will be a significant effect on the availability of power generating capacity if those plants now in the final stages of construction do not receive operating licenses by the dates previously anticipated, and every effort is being made to avoid unnecessary delays.

Sincerely f

Haro'ld R. Denton, Director Office of Nuclear Reactor Regulation e

l l

9 9

s A

9