ML19309A925

From kanterella
Jump to navigation Jump to search
Submits Addl Info Re Spray Pond & Piping Sys Expansion Joint Design Details.Joints Are Universal Type W/Two Bellows Connected by Center Pipe & Equipped W/Tie Rods.Sys Design Complies W/Ansi B31.1
ML19309A925
Person / Time
Site: Rancho Seco
Issue date: 08/06/1974
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8004010680
Download: ML19309A925 (2)


Text

_ _ _ _ _ _ _ _

e

.E

)

AEC DISTP.IEUTTON FO'l PART 50 DGbEET IMTERIAL l

(TD;PORARY FOP 21)

CONTROL NO:

8234 FILE:

FROM:

DATE OF DOC DATE. REC'D LTR

.TWX RPT OIHER Sacramento Municipal Utility Disti ict S cramento, California 95813 J. J. Mattimoe 8-6-74 8-9-74 X

TO:

ORIG CC OTHER SENT AEC PDR X

Mr. Ciambusso 1 signed CLASS UNCLASS PROP INFO IliPUT NO CYS RSC'D DOCNI;T NO:

i f

~

l' 50-312 XXXX DESCRIPTIO:::

ENCLOSUP,.ES :

Ltr furnishing requested addl info concerning joints recently incorporated into their spray

- ggggG the details of the design of the expansion g pyv ?<g 7 77 MuhN.3 VM M]

pond piping sys teta.............

DIST PER BUCKLEY PLANT :l/JiE: Rancho Seco FOR /.CTIO:!/IU70Pa'ATION 8-12-74 AB BUTLER (L)

/ SC1!7ENCER(L)

ZIE'! ANN (L)

REGAN(E) l u/ Cor,1ca U/2 copian W/ copien W/ copies CLARK (L)

STOLZ(L)

DICKER (E)

U/ Copies U/

P.... : a s W/

C.w f.t s W/ Ocpf.

l'AKKilh '

VAbsA LU(L)

KN1UM1b'd (d)

W/

Copies W/ Copies W/ Copies W/ Copico KNIEL(L)

PURPLE (L)

YOUNGDLOOD(E)

W/ Copics W/ Copies W/ Copics W/ Copies 5

INTERNAL DISTRIETIO::

"G FTT M TECH REVIEU DENTON LIC ASST A/T IND

'AEC PDR HENDRIE GRIMES BRAITMAN OGC, ROC'i P-506A f SCHROEDER GAMMILL DIGGS (L)

SALTZ &\\N HUN 12ING/ STAFF AiACQARY KASTHER GEARIN (L)

B. HURT CASE seTHIGHT BALLARD

/GOULBOURNE (L)

PLANS

/ GI!21BUSSO PAWLICKI SPANGLER KREUTZER (E)

MCDONALD BOYD SHA0 LEE (L)

CHAPMAN A iOCRE (L)(E!R)

STELLO ENVIRO MAIGRET (L)

DEYOUNG(L)(I IR)

HOUSTON IfULLER REED (E)

SKOViiOLT (L)

NOVAK DICKER SERVICE (L)

COLLER(L)

ROSS 1011Gl: TON SHEPPARD (L)

D. THOMPSON (2)

P, COLLINS IPPOLITO YOUNGSLOOD SLATER (E)

KLECKER i

DENISE TEDESCO REGAN SMITH (L)

EISENHUT l

KEG CPR LONG PROJECT LDR TEETS (L)

FILE & REGION (3)

LAINAS WILLIAMS (E)

WILSON (L) 8 0 0 4 010 $ g MORRIS BENAROYA HARLESS CTEELE VOLI!!ER

,t

..s...m.. L DISTP'TI C'M W

/ 1 - LCCAL FDR.,,_Eg ramento. CA

~

/1 - TIC (ABERNATHY)

(1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /LA/NY,

1 - USIC(EUCE"iNAN) 1-ASLBP(E/U Blda,Ra 529) 1-LIBRARIAN 1 - ASLB 1-W. PET;INGTON, Rm E-201 GT B",00KHAVEN NAT.

T. A 3 1 - P. R. DAVIS (AEROJET NUCLEAR) 1-CONSULTANT'S 1-AGMED(nnei cimec '

.d ID M f' esuu.

SACRAMENTO MUNICIPAL UTILITY DISTRICT D 6201 S Street, Box 15830, Sacramento California 95813; (916) 452-3211 August 6,1974 Mr. Angelo Gianbusso

~ ~> s Deputy Director for Reactor Projects

~

?,N Directorate of Licensing U. S. Atomic Energy Comission

%p\\

f i >.s.

t Washington, D. C.

20545

/.

AEC Docket No. 50-312

',1 b '.;

9 Rancho Seco Nuclear Generating i-Station, Unit No.1

Dear Mr. Giambusso:

In accordance with the request of your staff, we are hereby i

forwarding additional information regarding the details of the design of the expansion joints recently incorporated into our spray pond piping system.

The joints are of the universal type containing two bellows connected by a center pipe and equipped with tie rods. The design pressure, temperature, and deflections have been conservatively selected and exceed the maximum values imposed during simultaneous service condi-tions and operation through the Design Base Earthquake.

The design of the spray pond piping system including the expansion joints complies with ANSI B31.1 with additional Quality Assurance requirements as mentioned in our earlier submittal on this matter.

In addition, the design of the joints complies with the following paragraphs of Section III of the ASME Boiler and Pressure Vessel Code: NC 3624.2; l

NC3649.2(a),(b),(c),and(j).

The joints were manufactured by a company which is a current "N" stamp holder; however, the system piping design specification does not require stamping of the piping in this system and they are therefore not stamped.

Sincerely yours,

.. Y s

. J. Mattimoe accKETED Assistant General Manager M

A and Chief Engineer Aggg gg

{

5 cc: Dr. D. F. Knuth Wl'6 N

^

m b

'f AN ELECTRIC SYSTEM S E RVIN G MORE THAN. 600,000 IN THE HEART OF C A LIF O R N I A