05000338/LER-1980-035-99, /99X-0:on 800313,Westinghouse Informed Util of Potential for Supplied Control Rod Guide Tube Support Pins to Break Due to Stress Corrosion Cracking.Caused by Low Solution Heat Treatment Temp

From kanterella
(Redirected from ML19309A909)
Jump to navigation Jump to search
/99X-0:on 800313,Westinghouse Informed Util of Potential for Supplied Control Rod Guide Tube Support Pins to Break Due to Stress Corrosion Cracking.Caused by Low Solution Heat Treatment Temp
ML19309A909
Person / Time
Site: North Anna 
Issue date: 03/27/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309A908 List:
References
LER-80-035-99X, LER-80-35-99X, NUDOCS 8004010505
Download: ML19309A909 (2)


LER-1980-035, /99X-0:on 800313,Westinghouse Informed Util of Potential for Supplied Control Rod Guide Tube Support Pins to Break Due to Stress Corrosion Cracking.Caused by Low Solution Heat Treatment Temp
Event date:
Report date:
3381980035R99 - NRC Website

text

-

t LICENSEE EVENT REPORT CONTROL BLOCCC: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) i o

lV l^ lN l A lS l1 l@l 0l 0l -l 0l 0] 0l 0l 0l -l 0l 0l@l 4l Il 1l 1l Il@l l

l@

0 1 7

8 9 LICENSEE COO; 14 15 L6, NSE NUMBER 2S 2h LICENSE TYPE JO 57 U A T bd CON'T 3$,"C l Xgl 0l 5l 0l 0 l 0l 3l 3 l 8 @l 0 l 3 l I l 31 8 l 0 l@l O l 3 l 2 l 7 l 8 l n_l@

O i 7

8 60 6t

, DOCKET NUMBER 68 6')

EVENT OATE 74 75 HEPOR T DAT E 80 EVEP.T DESCRIPTION AND PROBABLE CONSEQUENCES h l On March 13, 1980, Westinghouse informed Vepco of a potential for their mtpplied enn 1 o a y g ;33 g trol rod guide tube support pins, solution heat treated below 19 50*F. to break due to I l stress corrosion cracking.

Since a Westinghouse safety evaluation concluded thnr enn l o a l trol rod operation would not be jeopardized by a broken pin for non-Upper Head Iniec-l o 3 l0 ls l l tion plants (i.e. North Anna Power Station), the health and safety of the cene rni mihikc l are mt af fected, l

o,

I O s l

U 7

8 9 OE CODE S BCO E COMPONEN T CODE SUB ode S

E g

lR l A]@ W@ U@ $ $ k $ $ lXl@ W @ W @

7 8Z 9

to 11 12 13 18 39 20 SEQUENTIAL OCCURRENCE REPORT REVIS80N m

LE R RO EVENT YE AR REPORT NO.

CODE TYPE NO.

@,Rg 18 l0 l

[_J p l3 l 5l [d

l 9l 9 l lXl

[-l [0]

_ 21 22 23 24 26 27 28 29 30 31 32 K'EN A

ON ON PL NT ET HOURS 22 S8 li FOR b B.

SUP e MANUF CTURER f

bgb@

l Z l@

C@

l0 l0 l0 lU l {@

U@

y@

lW l1 l2 l0 l@

33 34 3S 36 31 40 43 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h g l Certain support pins are susceptible to stress corrosion cracking due to their low I

solution heat treatment temperature.

Corrective actions to be taken are nending the I

y results of a Westinghouse support pin inspection program and their on-going materials l l test program.

I i 4 I

I 80 7

8 9 ST S

% POWER OTHER ST ATUS IS O Y

DISCOVERY DESCRIPTION [EJ g l1 l0 l0 lglNA l

{@l Notification from NSSS l

i s

' A TIVITY CO TENT REL SED OF R LEASE AMOUNT OF ACTIVITY LoCATIO'N oF RELEASE NA l

l NA l

U @ Ugj 1 s PERSONNE L ExeoSuEEs j 0"i"B";"Oigygi ' 5'"' ' " %O l

PERSONNE L INJURIES OESCRiPnO~@

gNuguRg 7

8 9 11 12 80 LOSS OF OR DAMAGE To FACILITY T PE DESCR8 ION hl l

1 9 7

8 9 10 80 ISglfL_ SIOESCgTION I

1I11I11111111 2 O 68 69 80 E 7

8 9 10 04010SC50se

,,n3g =

2, NAME OF PREPARER N-N-

I'A f ttFri oh,

)

Virginia Elsctric and Power Compcny North Anna Power Station, Unit #1

Attachment:

Page 1 of 1 Docket No. 50-338 Report No. LER 80-35/099X-0

Description of Event

Recent support pin inspections at a foreign plant revealed stress corro-sion cracking in Westinghouse supplied control rod guide tube support pins which had been solution heat treated at 1625'F.

The potential cracking of the control rod guide tube support pins is considered a generic problem and is being reported for information purposes.

Probable Consequences of Occurrence The purpose of the support pins is to prevent lateral movement of the guide tubes.

If a guide tube support pin should break, misalignment of-the guide tube could result, which, in turn, could restrict the movement i

of the associated control rod.

Because the safety evaluation performed by Westinghouse concluded that control rod operation is not jeopardized by a broken pin for non-Upper Head Injection plants (i.e. North Anna Power Station) due to the small gap clearance between the non-URI guide tube and the core plate, the health and safety of the general public are not affected.

The support pin cracking problem is generic to Unit 2.

As a preventive measure, the support pins in Unit 2 are being replaced with pinn having higher solution heat treat temperatures prior to the installation of the upper internals in the reactor vessel.

Cause of Event

f Certain guide tube support pins are susceptible to stress corrosion cracking because the temperatures at which they were solution heat treated were too low.

Immediate Corrective Action

Extensive accelerated corrosion testing has been conducted at Westinghouse R&D Center as a part of the investigation into the support pin cracking problem.

This testing has shown that the susceptibility of the support pie to stress corrosion cracking decreases with increasing solution heat treatment temperature and that support pins solution heat treated in the range of 1950*F to 2000*F have little, if any, potential for stress corrosion cracking even under the accelerated testing conditions.

Scheduled Corrective Action In the near future, Westinghouse will conduct ultrasonic inspections at two operat.ng domestic plants of guide tube support pins having solution heat treatment temperatures less than 1800*F.

The results of this support pin inspection program as well as the on-going materials test program will determine what further corrective actions, if any, are required.

Actions Taken to Prevent Recurrence No further actior.s are required.

i