05000318/LER-1980-019-02, /02L-0:on 800312,while Performing QC Insp,Cable A2Y0929P Was Found Incorrectly Routed,Which Violated Cable Separation Criteria.Caused by Personnel Not Following Designed Routing of Cable.Temporary Cable Installed

From kanterella
(Redirected from ML19309A822)
Jump to navigation Jump to search
/02L-0:on 800312,while Performing QC Insp,Cable A2Y0929P Was Found Incorrectly Routed,Which Violated Cable Separation Criteria.Caused by Personnel Not Following Designed Routing of Cable.Temporary Cable Installed
ML19309A822
Person / Time
Site: Calvert Cliffs 
Issue date: 03/25/1980
From: Bauer E
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19309A816 List:
References
LER-80-019-02L, LER-80-19-2L, NUDOCS 8004010383
Download: ML19309A822 (1)


LER-1980-019, /02L-0:on 800312,while Performing QC Insp,Cable A2Y0929P Was Found Incorrectly Routed,Which Violated Cable Separation Criteria.Caused by Personnel Not Following Designed Routing of Cable.Temporary Cable Installed
Event date:
Report date:
3181980019R02 - NRC Website

text

(1-71l LICENSEE EVENT REPORT CONTROL BLOCK: [l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

10111 lM l0 lC lC lti 12 l@l 0l Ol -l 010l 01 Ol 01 -101 Ol@l 4 l 1l l l 1! 1l@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUMSER 25 26 LICENSE TYPE Jo 57 CAT 68 I o I 1 l g"7,y l L l@l0 15 10 l 0 10 13 Il 18 l@l0 13 11 12 18 10 l@l 013l 2l 51810 l@

CON'T w,

7 8

60 61 DOCK ET NUM8ER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT oESCRIPTION AND PROBABLE CONSEQUENCES h 10121 lWhile performing a Ouality Control Inspection in the Unit 2 cable spreadina i

I O ia i I room, it was found that Cable #A2y0929P was incorrectly routed from 2R01 A to l

1 O 14 i Icable tray #ZB2AG13 and then back to its proper cable tray #ZA2AH03, thus l

1015 I lviolatina the cable seoaration criteria by crossing from a ZB to ZA facility.

I I his is not a repetitive occurrence.

I T

1O is l io i7I I l

l 0 l8 l l l

80 7

8 9 DE CODE SU8C E COMPONENT CODE SUSCODE SU E

10191 I Z l2 l@ J@ W@ [ Z l Zl Z l Z l Z l Z l@ lZ l@ lZ l@

a SEQUENTIAL OCCURRENCE REPORT R EVISION LE R/RO EVE 4T YEAR REPORT NO, CODE TYPE NO.

@,RE l 8101 l-l l 0lll 9l l0 l2 l lL l

[-j l0 l

_ 21 22 23 24

6 27 28 29 30 31 32 T

N AC ON ON PL NT MET HOURS S 8 i O

FOR 8.

SUPP LIE R MANUFACTURER IX l@lZ_J@

l Zl@

(_Zj@

l01010l0l [JJ_j@

[Ji_l@

[ Zj@

lZl9l9l9l@

33 34 36 M

37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS li l o i [ Construction personnel did not follow the designed routing of cable #A2YO929P.

I li li i IThe interin carrective action was to install a temporary cable from 2R01 A to I

ii12i 12Y09 and deeneraize the incorrectly installad cable.

The temnorary cable will 1

4 ii13i l be replaced by a cemanent cable in the correct routino in the immediate future.

I l i 141 1 I

ST S

% POW E R OTHER STATUS DISCO A DISCOVERY DESCRIPTION 32 IiI5I [E_j @ l0 l9 16 l @ l flA l

l C l@l 0.C. Inspection of Work on FCR 79-1034 l ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE Ii l6 I W @ ~W@l flA l

l tlA l

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE

DESCRIPTION

l i l 71 10 l 0 l o l@LZ_J@l f1A l

,ERSON~E L,N3UJiES oESCR,PTiO~@

~UM8 E R Lthj l 010 l 0 l@l flA l

7 8 9 it 12 80 TYPE DESCR PT ON lil91LLl@l tt^

l 7

8 9 10 80 L2_LO_J tjl [@ DESCRIPTION ISSUE 7

a 9 _

l flA l

lIlIIIlIiili15 10 68 69 80 %

E. R. Bauer pgoye.I w s

  • A722 NAME OF PREPARER 80040103 83