ML19309A257

From kanterella
Jump to navigation Jump to search
Forwards Special Operating Procedures R-2-79-52 & R-2-79-53 Used to Hydrostatically Test Decay Heat Removal Sys.Packless Valves Employed in Sys Are Grinnel 2741 Valves
ML19309A257
Person / Time
Site: Crane  Constellation icon.png
Issue date: 02/19/1980
From: Wilson R
METROPOLITAN EDISON CO.
To: Jay Collins
NRC - NRC THREE MILE ISLAND TASK FORCE
Shared Package
ML19309A258 List:
References
TMI-II-R-4089, NUDOCS 8003270162
Download: ML19309A257 (1)


Text

i e'

TF-Metropolitan Edison Company Post Office Box 480 gj Middletown, Pennsylvania 17057 717 9444 041 Writer's Direct Dial Number February 19 1980 TMI-II-R-40$9 Mr. J. T. Collins, Deput4 Director U. S. Nuclear Regulatory r'mmiasion

7. 'Ihre Mlle Island Nuclear Station P.O. Box 480 Middletown, Pa. 17057

Dear Sir:

Three Mlle Island Nuclear Station, Unh.t II (Dir-2)

Operating License No. DPR-73 Dtcket No. 50-320 Decay Heat Reoval Syste Hydrostatic Testing As requested in a telophone conversation between Tom Poindexter (USNRC) and W. J. Papproth (GhJ) we are forwarding the procedures employed to hydrostatically test the Decay Heat Raoval Systes for HfI-2 as in-dicated by Attachment; I, " History DHR Hydrostatic Testing", to our letter serial GOL 1295 of October 16, 1979.

We believe the enclosed procedures (R-2-79-52 and R-2-79-53) provide the information requested. Also, the packless valves enployed in the systen are Grinnell #2741 valves.

If there are any questions, please advise.

cereLy, (N%

. v.

on

[

Director, HfI-2

,f fv RFW/

/WJP/kd En osure cc:

J. C. DeVine, Jr.

R. Vollmer T. Poindexter file (3) og s

,$)

l l

Metropohtan Ed: son Company is a Member of the General Pubhc Utilities System

- x

--