Responds to Bulletin 72-3 Re Potential Valve Operator Switch Problem.No Limitorque Models SMB-00 or SMB-000 Valve Operators Mfg Between 1969 & mid-1971 Installed or Scheduled to Be Installed
ML19309A231
Person / Time
Site: Rancho Seco
Issue date: 01/11/1973
From: Searls F
PACIFIC GAS & ELECTRIC CO.
To: Rich Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19309A211 List:
References
IEB-72-03, IEB-72-3, NUDOCS 8003260930
Download: ML19309A231 (1)


Text

,

i i

i V

,,\\ -

}

I t

\\

,i

~%d e

PACIFIC GAS AND E LE C T RIC C O M PANY bbW3 l

7 7 B E ALE S TR EET. SAN F R ANCISCO. C ALIFOR NI A 94106.(415) 781 4211 P R E D E R 1 C K T. S E A R L S

.= m u s.

January 11, 1973 C'".017J 1

............... m e.. m d OHN C. MORRIS S EY Na E. *

.. c.... u.... e...m

"
.".'l;-
.

..u...

.. uos.

'"'."."*t;."'ll20:*'

u.

u.i.eoi..

..u..u.

c..

..v.v.

o u..

.".-l',";l.7
.";

m.s.a

. a. u.c a,u.a.

c--~c--.-

    • 10:7.".".J.C... "."..

..u..........

. ;'.. 'rTl.':.

.s.

Mr.

R. W. Smith, Director Directorate of Regulatory Operations Region V United States Atomic Energy Commission 2111 Bancroft Way Berkeley, California 94704

,rN

)

Re:

Docket No. 50-133 V

Dear Mr. Smith:

This is in reply to your letter dated Decem-ber 6, 1972.

You requested that we determine whether any Limitorque Models SMB-00 or SMB-000 valve operators which were manufactured between 1969 and mid-1971 are installed or scheduled to be installed at the Humboldt Bay Power Plant Unit No. 3.

Our investigation indicates that there are no valve operators of this mako, model, and vintage installed or scheduled to be installed at this plant.