ML19309A050

From kanterella
Jump to navigation Jump to search
Amend 4 to Application for CP & Ol,Including Info on Engineering Changes Developed Since 670810 & PSAR Revisions. Suppl 3 Responds to AEC 680308 Informal Questions
ML19309A050
Person / Time
Site: Crystal River, 05000303  Duke Energy icon.png
Issue date: 03/11/1968
From:
FLORIDA POWER CORP.
To:
Shared Package
ML19309A047 List:
References
NUDOCS 8003240883
Download: ML19309A050 (3)


Text

m 3

.~ . ' - ,

O BEFORE THE UNITED STATES-ATOMIC ENERGY CO}911SSION AMENDMENT No. 4 Regulatory Cuj pl File Cy.

TO APPLICATION BY FLORIDA POWER CORPORATION FOR A SECTION 104b CONSTRUCTION PERMIT AND LICENSE MR A UTILIZATION FACILITY DOCKET NOS. 50-302)& 50-303 V

Florida Power Corporation, a corporation organized and existing under the laws of the State of Florida, applicant for an oper-ating license and construction permit for Crystal River Units 3

& 4 Nuclear Generating Plant, .hereby amends, by attached pages,-

its application to include information on engineering changes developed since the original application submission on August 10, 1967.

This amendment to the application contains no restricted data or other defense information.

,a

  • x

?-) I ! 9, .

g O '. w Dcc3;

.., 0 g u. m

- 9 MApr4 C

. 1963 1 :--

V G 1t- .2 g

%l:}D 'a xp. a: 4 8 0 03 240 ff}

f-

's g

. s f

890

Amendment No. 4 Page 2 IN WITNESS WHEREOF, the applicant.has caused its name to be hereunto signed by J. T. Rodgers, Nuclear Project Manager, and its corporate seal to be hereunto affixed by J. G. Loader, Secretary, thereunto duly authorized this lith day of March, 1968.

FLORIDA POWER CORPORATION By J'.T.Rodgerf i Nuclear Project Manager l ATTEST:

'/ i a: . .\ cbe.

vJ. G. Loader Secretary (CORPORATE SEAL)

Sworn to and subscribed before me this lith day of March,1968.

Notary Public l My Commission Expires:

Notory Public State el Florida of Large.

My Commission Empires July 9,1970 i

(NOTARIAL SEAL) l

. .' 3 Ncketsdo-30 and -303

,.:.' ' march 1k, 96 s

v ' i, G b AMENDMENT NO. k O.

g 7.;qp _

2 FLORIDA POWER CORPORATION

+

Crystal River Plant Units 3 & b Amendment No. 4 to the Florida Power Corporation's Preliminary Safety Analysis Report includes both insert pages, as listed below, and Supplement No. 3.

Supplement No. 3 consists of ansvers to eight " Informal" Questions. Supplement No. 3 should be inserted in Volume'4.

The following sheets of the Florida Power Corporation's Preliminary Sarety Analysis. Report are to be deleted and, where appropriate, revised sheets dated 3-14-68 should be inserted.

Remove the following sheets: Insert the following sheets:

Pages: Table of Contents: vii Pages: Table of Nntents: vii (1 each in Volumes 1, 2, 3, 4, (1 each in Volumes 1, 2, 3, 4, and Appendices) and Appendices)

Pages: 7-11, 7-1 and 7-2. Pages: 7-11, 7-1, T-2, and 7-2a.

Pages: 1h-45 and 14 h6. Pages: 11. 45 and 14-46.

Pages: 5A-3 and 5A-4. Pages: 5A-3 and 5A-4.

-Pages: 5B-1 and 5B-2. Pages: 5B-1 and 5B-2.

Pages: SC-3 and 5C-4 Pages: SC-3 and SC 4. l Revisions to Supplement No. 1 (Volume h)

Pages: 9.12-1 and 9.12-2 Pages: 9.12-1 and 9.12-2 Revisions to Supplement No. 2 (Volume h)

Pag.es: Informal Question 1 -- Pages Pages: Informal Question 1 -- Pages 1-1 and 1-2. 1-1 and 1-2.

Pages: Proposed Procedure of Site Pages: Proposed Procedure of Site Preparation and Construction of Load Preparation and Construction of Ioad Bearing Fill -- Cover Sheet and Bearing Fi31. -- Cover Sheet and Page 1. Page 1.

/} $s l

x, l

L ,:,- P i

.~

. , ,., m s .

6 J