ML19308E180

From kanterella
Jump to navigation Jump to search
Notification of Postponement of First Technical Meeting U/Util Scheduled on 671031.Second List of Questions Sent to Met Ed.Answers by Met Ed,B&W & Gilbert Associates,Inc to Result in More Meaningful Meeting
ML19308E180
Person / Time
Site: Crystal River, 05000303  Duke Energy icon.png
Issue date: 10/24/1967
From: Long C
US ATOMIC ENERGY COMMISSION (AEC)
To: Levine S
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8003240714
Download: ML19308E180 (1)


Text

.

.-p n,' a n + -n..,n..,,,,,,- -

t ;;,.,

n

,n

  • yj,,gg m:e;;w ; c.9-:~.;- : ;

3.~,- y~ p ;:34,i:-.

...s.

%:s

m - n.
=

c y yc.m:' w v7-t ; %,,,;.:,; - a!

ex::.. :s. +.. r, -:c

.n,

_ m.

n.

C.. w m v v.

2; yw-j

- 7.

1; SOPPLEMENTAL

.~

f f

FILE COPY; 00T 2 /1967

~

Saul Levina, Assistant Director for Reactor Technology, DRL R. S. Boyd, AD/RP, DRL, g gped by

.j TURUt Cil@"

k Charles G. Long, Chier~

Reactor Project Branch No.C)fhc, t.c4 YLORIDA POWER CORPORATICBI. - CRISTAL RIVER - DOCKET NOSI. 50-302/303 A first technical meeting with Florida Power Corporation, in regard to the Crystal River Units 3 & 4, had been scheduled for October 31, 1%7. That ::ceta;; date has been delayed. We are sordfr-g a second list of questions to Metropolitan Liisca; the answers to checs quastions will affect Crystal River. A more r.caningful aceting will result from vaitin3 for the Met-Ed., B W, cad GAI cncuers.

cc: RT Brr ch Chiefs Distribution:

Suppl. (2g fac DEL luding RPBi!3 Reading Orig: CGLen3

2. S. Boyd D

D PIE 1

1

~

emer, 'RPBf3/DRL-f

/ff

}pyyy g y.

_g

~ ~ ~

= ~

j:j[,

ccjgnstit.1 M

so -,

oct, 10/24/67.-

7,_

10-24-67 N~ ment

,