Concludes That Hardware Mods Not Required for ATWS Considerations Due to Inherent Facility Features,Time of Plant Design & Low Probability of ATWS Event Occurrence. BAW-10099 to Be Incorporated as Amend 44 to FSAR
ML19308E094
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/28/1975
From: Rodgers J
FLORIDA POWER CORP.
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
References
RTR-WASH-1270 1154, NUDOCS 8003200819
Download: ML19308E094 (2)


Text

i o

NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL (TEMPOR ARY FORM) i CONTROL NO:

1154 FILE:

  • FROM: Florida Power Corporatior DATE OF DOC DATE REC'D LTR TWX RPT OTHER St. Petersburg, Fla J.T. Rodners TO:

ORIG CC OTHER SENT AEC PDR xxxx Mr. A. Ciambusso 1-signed.

SENT LOCAL PDRxxxxxv CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

xxxxx 1

50-302 DESCRIPTION:

ENCLOSURES:

Ltr ref WASH-1270 ATWS guidelines for Uucicar Power Plants as related to Crystal

" River Nuclear Generating Plant,......

PLANT NAME:

Crystal River #3 j

FOR ACTION /INFORMATION 2-3-75 JG B BUTLER (L) 366HWENCER (L) ZIEMANN (L)

REG AN (E)

W/ / Copies W/ Copies W/ Copies 8

W/ Copies CLARK (L)

STOLZ (L)

DICKER (E)

LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Copies lecker PAR R (L)

VASSALLO (L)

KNIGHTON (E)

SPELS W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L)

PURPLE (L)

YOUNGBLOOD (E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION Gh m r "8 TECH REVIEW DENTON LIC ASST A/T IND v6RC PDR SCHROEDER GRIMES R. DIGGS (L)

BRAITMAN OGC, ROOM P-506A MACCARY GAMMILL B. GE ARIN (L)

SALTZMAN GOSSICK/ STAFF KNIGHT KASTNER vt. GOULBOURNE (L)

MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E)

GIAMBUSSO S)1AO SPANG LER J. LEE (L)

PLANS BOYD g6TELLO M. MAIGRET (L)

MCDONALD MOORE (L)

HOUSTON ENVIRO S. REED (E)

CHAPMAN DEYOUNG (L)

NOVAK MULLER M. SERVICE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICKER S. SH EPPARD (L)

E. COUPE GOLLER (L) (Ltr)

IPPOLITO KNIGF7N M. SLATER (E)

PETERSON P. CO LLINS TEDESCO YOU N' LOOD H. SMITH (L)

HARTFIELD (2)

PENISE LONG REGAlv S. TEETS (L)

K CKER

  1. EG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)

ISENHUT FILE & REGION (2)

BENAROYA V. WILSON (L)

WIGGINTON T.R. WI LSON VOLLMER HAR LESS R. INGRAM (L)

STEELE

/

EXTERNAL DISTRIBUTION mf

/ - LOCAL PDR Cvrstal River, Fla

ei 1

1 -TIC (ABERNATHY) (1)(2)(10)- NATIONAL LABS 1 - PDR-SAN /LA/NY '

1 - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E-201 GT 1 - BBOOKHAVEN NAT LAB 1 - ASLB 1 - CONSULTANTS 1 - G. U LRIKSON, ORN L

/1 - Newton Anderson NEWM ARK /BLUM E/AG BABI AN 1 - AGMED (RUTH GUSSMAN)

I h ACRSM/SENT Rm B-127 GT v

1 - J. D. RUNKLES, Rm E-201 O d,4[k, GT 8003200 8/7 g

y-

-g g.e [$*c,

,e7 y lf h;

gl

% Mg c

Florida

[

January 28, 1975 Mr. A. Giambusso Deputy Director for Reactor Projects Directorate of Licensing Office of Regulation U.S. Atomic Energy Commission Washington, D.C.

20545

..In Re:

Florida Power Corporation Crystal River fiaclear Generating Plant Docket No. 50-302

Dear Mr. Giambusso:

In late 1973, the Regulatory Staff expressed in WASH-1270 a detailed licensing position on Anticipated Transients Without Scram Analysis (ATWS), which established present and future guidelines for nuclear power plant licensing.

In response to the WASH-1270 licensing position, Babock & Wilcox submitted to the Directorate of Licensing (DOL) topical report BAW-10099, " Babcock & Wilcox Anticipated Transients Without Scram Analysis", dated December,1974. The results of this topical report adequately represent Crystal River Unit No. 3 and are intended to supplement BAW 10016, " Analysis nf Anticipated Transients Without Trip",

dated September,1972, which is currently on file with the Commission.

Considering in total the inherent p1' ant features, the time when the

' plant was designed, and the low probability of occurrence for ATWS events, we have concluded that hardware modifications at Crystal River Unit No. 3 are not required for ATWS considerations.

Topical Report BAW 10099 will be adopted as part of our application via of Amendment No. 44 to the Crystal River Unit No. 3 FSAR, which will be filed with the Commission on February 4, 1975.

Very i.r.41) yours, J.. Rodgers Assistant Vice President JTR: hic l ' 51]

General Office 3201 ininy-founn street soutn. P O Box 14042 St Petersburg. Ftonca 33733 813-866-5151

-. - -