AEC DI'"'RIBUTIO~1 FOR PART 50 DOCXET MA"
('Er20RARY FORM)
C07, TROL NO:_ 1386 FROM:
717L DATE OF DOC:l DATE REC'D LTR EXO RP2!OPER Florida Power Corporation St. Petersburg, Fla. 33733.
.T. m. Podcers I
TO:
2'22-73 2-27-73 X
1 ORIG CC CTMR Mr. Diambusso 55ST AEC ?D3_
y
_1 EhT LOCAL PDR CLASS:
QUJPROP 1570 y
INPUT NO CYS REC'D LOCETEO:
DESCRIPTION:
1 S0-302 Ltr furnishing info re Florida Power Corpora-INCLOSURES:
tion's current' position on the re-evaluation of the probable maximum hurricane (PMH) surge height at the Crystal River Unit 3.......
~~~
DIST PER F. LOG-ui C.
PLANT NAES:
Crystal River Unit 3 BITMA(L)
FOR ACTION /INFORMATION v SCHWENCER(L) 3-1-73 AB W/ Copies W/4 Copies SCHEMEL(L)
KNIGHION(E)
W/ Copies W/ Copies CLARK (L)
STOLZ(L)
W/ Copies W/ Copies W/ Copies W/ Copies ZIEMANN(L)
YOUNGBIDOD(E)~
GOLLER(L)
VASSALID(L) '
W/ Copies W/ Copies CHITWOOD(FM)
REGAN(E)~
' KNIEL(L)
W/ Copies j
i W/ Copies H. DEIRON W/ Copies W/ Copies W/ Copies W/ Copies
. DICKER (E)
(REGFILE IIhutNAL DISTRIBUPION TECH REVIEW VOLI2ER HARLESS
.HEHDRIE vDENION WADE E
OGC, ROOM P-506A SCHROEDER
/ GRIMES SHAFER F&M MuteZING/ STAFF MACCARY GAMMILL EPIGY F&M CASE BROWN E
GIAMBUSSO KNIGHT (2)
KASTNER G. WILLIAMS E NUSSBAUMER E. GOULBOURNE L PAWLICKI BALLARD BOYD-L(BWR)
SHA0 A/T IND SPANGLER LIC ASST.
DEYOUNG-L(PWR)
KIR7fH BRAITMAN SKOVHOLT-L STELIO SERVICE L SALTZMAN P. COLLII:S ENVIRO MOORE MASON L
MULLER ~
WIISON L
PLANS HOUSTON DICKER REG OFR MAIGRET L MCD01MLD TEDESCO KNIGHTON IILE & REGION (2)
IDNG SMITH L
DUBE ORRIS YOUNG 3IDOD GEARIN L
LAINAS ITEELE FROJ LEADER DIGGS L
INFO BENAROYA TEEPS L
E~~EILES REGAN L
~
un.Hi!AL DISTRIBITITON
.IDCAL PDR crystn1 Piver m.
- 1'm(AEERNATHY)
.NSIC(WCHANAN)
(1)(2)(9)-NATIONAL LAB'S
~
i LAff
-PD -
ASLs_-m/SAYs 1-R. CARROLL-0C GT-B227 1-GERALD LELIDUCHE ODWARD/H. ST.
1-R. CATLIN, E-236-GT BROOKHAVEN NAT. LAB 3
CYS ACRS HOLDING 1-CONSULAf1T'S NEWMARK/BLU17/AGABIAN 1-AGMED(WALTER KOEST @
Pm C 427, GT)
V 8 0 03 20 0 7Q l~"" * *" '** ' " #~3*2
- W;yL
~Ryuk n.
j J.
'[.y c%s s
y g,
e.,
$$Ca@IhO$
?
I
]
Flodda Po...w..e, _r February 22, 1973
-~
Mr. A. Giambusso Deputy Director for Reactor Projects Directorate of Licensing
/>
U.S. Atomic Energy Commission p!.
Washington, D.C. 20545 i.-i.i..
Subject:
Crystal River Unit #3 UA 4f j g,
i i-Qp Nuclear Generating Plant (c)c Docket No. 50-302
[ t M., -
c3
Dear Mr. Giambusso:
This is to inform you of Florida Power Corporation's current position on the re-evaluation of the p.obable maximum hurricane (PMH) surge height at the Crystal River Unit 3 Nuclear Plant. Meetings were held in Washington on February 2 and 15,1973, with members of your staff and consultants from the U.S. Army Corps of Engineers - Coastal Engineering Research Center. At the February 15 meeting, our con-sultants, Dames and Moore, presented new information regarding their analysis and also submitted their (heretofore proprietary) computer program for AEC/CERC verification and results of actual program runs to the AEC.
At meeting's end on February 15, we were advised by the AEC repre-sentative that four (alternative) courses of action were possible for resolution of the differences in predicted PMH surge height between the AEC and Florida Power Corporation:
1.
Florida Power Corporation accept the AEC position of 33.4 feet.
2.
AEC accept the Florida Power Corporation position of 29.6 feet.
3.
Based on the February 15 meeting input by Dames and Moore, Florida Power docket a position of 32.1 feet with proposed AEC acceptance.
4.
Delay the decision on surge height for six (6) months before AEC-CERC can complete review and assessment of Dames and Moore work - with no indication to what the final design surge height would reach.
1386 General Office 3201 inirty-fourtn street soutn. P.O Box 14o42. St Petersburg. Fionda 33733 813--866-5151
Mr. A. Giambusso February 22, 1973 We wish to inform you of our decision to remain with 29.6 feet (original design height was 24.5 feet) as a conservative PMH surge height and feel that such a position is justifiably conservative based on the Dames and Moore work. We accept the alternative to have AEC-CERC evaluate the Dames and Moore efforts, but feel strongly that your six (6) month review schedule is inconsistent with the "overall licensing' schedule, possible backfitting of design and con-struction, and the high priority of AEC concern to resolve such issues.
Our consultants, Dames and Moore, advise us that they can, in approximately sixty (60) days, both confirm computer program differences relating to surge height prediction as compared to the AEC-CERC program e
and calibrate their analysis based on actual hurricane data. We feel that resolution of the surge be resolved within sixty (60) problem based on these facts can certainly to ninety (90) days. We would request that AEC-CERC agree to this same schedule.
We are most anxious to resolve this matter at the earliest possible date so that risk to the licensing and overall project schedule for Crystal River Unit 3 is minimized. We trust that the appropriate action and schedule can and will be imposed by all for final resolution of this matter in sixty (60) to ninety (90) days.
Very truly yours,
^
i
-d,k M.~llE&
J. T. Rodgers Asst. Vice Presiden,t JTR/iw