ML19308E006

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Provisional CPPR-51
ML19308E006
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/25/1968
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To:
Shared Package
ML19308E004 List:
References
NUDOCS 8003200741
Download: ML19308E006 (1)


Text

_. _ _ _-_ _ ____________ ____

,- m UNITED STATES ATOMIC ENERGY COMMISSION g*

DOCKET NO. 50-302 FLORIDA POWER CORPORATION NOTICE OF ISSUANCE OF PROVISIONAL CONSTRUCTION PERMIT Notice in hereby given that, pursuant to the Initial Decision of the Atomic Safety and Licens'ag Board, dated September 24, 1968, the Director of the Division of Reactor Licensing has issued Provi-sional Construction Permit No. CPPR-51 to the Florida Power Corpora-tion for the construction of a pressurized water nuclear reactor, designated as Crystal River Unit 3 Nuclear Generating Plant, on the applicant's site on the Gulf of Mexico, about seven and one-half miles northwest of the town of Crystal River, Citrt_c County, Florida.

The reactor is designed for initial operation at approximately 2452 megawatts (thermal).

A copy of the Initial Decision is on file in the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C.

FOR THE ATOMIC ENERGY COMMISSION "g M SiF.d by.

y

.u: A.!uC913 Peter A. Morris, Director Division of Reactor Licensing Dated at Bethesda, Maryland this 25th day of September,1968.

80082007f[

.