ML19308D965
| ML19308D965 | |
| Person / Time | |
|---|---|
| Site: | Crystal River, Maine Yankee |
| Issue date: | 02/22/1974 |
| From: | Schemel R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | |
| Shared Package | |
| ML19308D962 | List: |
| References | |
| NUDOCS 8003200709 | |
| Download: ML19308D965 (3) | |
Text
~
IN
< ~
UNITED STATES ATOMIC ENERGY COMfISSION DOCKET N0. 50-309 o
MAINE YANKEE ATOMIC POWER COMPANY (MAINE YANKEE ATOMIC POUER STATION)
NOTICE OF AVAILABILITY OF DECISION OF THE ATOMIC SAFETY AND LICENSING APPEAI. BOARD AND NOTICE OF ISSUANCE OF AMENDMDIT NO. 2 TO FACILITY OPERATING LICENSE NO DPR-36 FOR THE MAINE YANKEE ATOMIC POWER STATION Pursuant to the United States Atomic Energy Commission's regulation in Appendix D, Section A-11, to 10 CFR Part 50, notice is hereby given that the Atomic Safety and Licensing Appeal Board has rendered their decision dated November 30, 1973, of the review of the Initial Decision by the Atomic Safety and Licensing Board and the exceptions to the Initial Decision by the intervenors in the proceedings that authorizsd the issuance of an operating license to the Maine Yankee Atomic Power Company. The operating license is for the operation of the Maine Yankee Atomic Power Station, a pressurized, light-water nederated and cooled reactor, that is designed for initial operation at 2440 megawatts (thermal), and is located in Lincoln Cotiaty, Maine.
The Initial Decision and the Decision dated November 30, 1973, are available for inspection by the public in the Com-mission's Public Docunent Room at 1717 H Street, H. W., Washlagton, D. C.,
and in the Ui.scasset Public Library Association, Ifigh Street, Ulscasset, Sinine.
8.008200 Of W,
~
- ,c,
p..
~
]
liased upon the record developed in the above captioned matter, the Decision modified in certain respects the, contents of the ' Final Environmental Statement relating to the operation of the Maine Yaakee Atomic Power Station prepared. by the Commission's Directorate of Licensing. A copy of the Final Environmental Statement is also available for public inspection at the above designated locations.
Pursuant to the provisions of 10 CFR Part 50, Appendix D, Section A-11, notice is hereby given that the Final Environmental Statement is. deemed modified to the extent that the findings and conclusions relating to environmental matters contained in the Decision are different from those contained in the Final Environmental Statement. As required by Section A-ll;,
of Appendix D, a copy of the Decision, which modifies the Final Environmental Statement, has been transmitted to the Council on Environmental Quality and is being made available to the public as noted herein.
In accordance with the Commission's regulations in 10 CFR Fart 2, notice -
is hereby given that pursuant to the Decision, Amendment No. 2 to the operating license has been issued by the Commission's Directorate of Licensing.
The amendment adds a condition to the license for the protection of the environnent that requires the licensee to abide by the mixing zone criteria in the Augunt 23, 1972 order of the Department of Environmental Protection of the State of Maine or in a'ny amendments to that order. - Appendix B of-the
- icchnical Specifications of License No. DPR-36 is also being changed to comply with the Decision.
i
~-
~
s>
-3' V
~ (,.)
, Single copics-of the Decision dated November 30,1973; /cendraent No. 2.
.;.2 'Lic.: nae Ma. DPR-3c; and of the Final Eavirone.eatal Statua:ent sy be
- -obtained by writing to the U. S. Atomic Energy Commission, Washington, D. C.-
20345,' Attention: - Deputy Director for Reactor Projects, Directorate of Licensing.
Dated at 'Bethesda, Maryland, this 22nd day of February 1974.
FOR THE ATOMIC ENERGY COM-IISSION a
\\p' 3(. %n.1
'q g
~
Robert J.LSchemel, Chief
~
Operating Reactors Branch #1 Directorate of Licensing e
'-w'-
e s=>-
i+**m-~
=mma r n
% w s
m-e h **
u 1
,n-
,