ML19308D909
| ML19308D909 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/11/1972 |
| From: | Muller D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Yarborough J FLORIDA, STATE OF |
| References | |
| NUDOCS 8003200660 | |
| Download: ML19308D909 (3) | |
Text
-
[
UNITED STATES Distribution C
ATOMIC ENERGY COMMISSION.
Docket File (E
, 5'. [
WASHINGTON. D.C. 20$45 AEC PDR
%, N\\,
Local BDR
84 5
D. Sells, EP-2 G. Williams, EP-3 Mr. Jess Yarborough, Esq., Chairman k b A##d'd3 Florida Public Service Comission 700 South Adams Street Tallahassee, Florida 32304 i
Dear Mr. Yarborough:
~
I am forwarding for your review and coment the Draf t Environmental Impact Documentation identified in the enclosure to this letter.
The Draft Environmental Statement was prepared by my staff in accordance with the statement of general policy and procedures of the implementation of the National Environmental Policy Act of 1969, as set out in Appendix D of the Commission's regulations 10 CFR Part 50.
In accordance with the Comission's regulations as pttblished in the Federal Register on July 28, 1972 (37 F.R.152 30), the coment period on the Applicant's Envir'onmental Report and the AEC Draft Detailed Statement for State and local agencies and interested members of the public has been changed from seventy-five (75) days to forty-five (45) days, conforming to the time allowed Federal agencies. Please provide coments on this Draft Environmental Statement within forty-five (45) days from the date of this letter.
Please cotitact me or my staff regarding any problems which may be encountered in these watters.
(Phone:
301/973-7261)
Sincerely, O#inal signed by Ddaal R. Muller a Daniel R. Muller, Assistant Director for Environmental Projects Directorate of Licensing
Enclosure:
List of Documents Transmitted (1)
CONCURRENCE:
L:EP-3 M
L:B/C-EP-3 L:ADEP
.m GWilliamk pgood
-y Sells JYou DMuller 9/pl fp1' 9f7 0 '! *~
8003200 [ [O ye[u.cu> J
3 f.s
SUMMARY
AND CONCLUSIONS This Draft Environmental Statement was prepare'd by the U. S. Atomic Energy Commission, Direct' orate of Licensing (staff).
1.
This action is administrative.
2.
The proposed actions are the continuation of the provisional construction permit CPPR-51 and the issuance of an operating license to the Florida Power Corporation for the startup and operation of Crystal River Plant, Unit No. 3, a nuclear power reactor located on a site already occupied by two operating oil-fueled electrical generating plants. The site is on the Gulf of Mexico in the State of Florida and near the town of Crystal River, Citrus County, (Docket No. 50-302).
Unit No. 3 will employ a pressurized water reactor to produce initially 2452 megawatts thermal (MWt). With the contribution from the reactor coolant pumps added, a gross electrical output of 855 megawatts electric (MWe) will result. A design power level of 2544 MWt (885 MWe) is anticipated at a future date and is considered in the assessments contained in this statement.
The exhaust steam will be cooled by once-through flow of water obtained from and discharged to the Gulf of Mexico, l
3.
Summary of the cumulative environmental impact and adverse effects of Units 1, 2 and 3:
Land areas disturbed during construction of the station, but not to be occupied by buildings or facilities, are to be allowed to revert to a natural condition.
The annual loss of juvenile and small finfish and shellfish on the intake screens (now estimated at 36,000 lb for U its 1 and 2) will increase due to the increased flow n
j volume.
Entrainment of passing drift organisms is anticipated and 100% mortality of these organisms during their passage through the conderser cooling system is assumed. Total plankton popula..ons in the area are not expected to be appreciably affected.
At full power, condenser cooling water heated to 14.5"F (8.l*C) above inlet temperature will be discharged at the rate of 2940 cubic feet per second at the shoreline of the Gulf of Mexico.
i N
p LIST OF DOCUMENTS TRANSMrITED Name of Facility:
Crystal River Unit No. 3 Applicant:
Florida Power, Corporation Docket Number:
50-302 Documents Transmitted: Draft Environmental Statement for Crystal River Unit No. 3 dated September 1972 l