ML19308D876

From kanterella
Jump to navigation Jump to search
Confirms 730905 Telcon Re 730919 Meeting W/Util to Discuss Role of Director of Regulation & Directorate of Regulatory Operations Insps During Preoperational Testing,Startup & Operation.Agenda Encl
ML19308D876
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/07/1973
From: Moseley N
US ATOMIC ENERGY COMMISSION (AEC)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19308D877 List:
References
NUDOCS 8003191091
Download: ML19308D876 (4)


Text

_ _ __ _ _ _ _

1 I

f 4

I i

Ltr to Florida Power Corporation fm N. C. Moseley

      • SEP 7 1973 DISTRIEUTIOM:

H. D. Thornburg, RO RO:HQ (4)

Directorate of Licensing (4)

-;&R Central Files i

PDR Local PDR NSIC I

DTIE, OR State I

e 4

4

~

G S

8003191077 g

I f

1 e Ms.,

UNITED STATES p

'h ATOMIC ENERGY COMMISSION

! _ i e ' I~-

DIRECTORATE OF REG'FlTCRY CPI?ATICUS l

g+,,7,'

//

accion si - sviT e sie f

230 pc Acar a ct sr ac e?, Near **csr

,m, D4 fg5 C%

Ar L A pef A, GECRGs A 30303 SEP 7 1973 In Reply Refer To:

RO:II:MSK l

50-302 Florida Power Corporation l

ATTN:

J. T. Rodgers 1

Assistant Vice President i

P. O. Box 14042 l

St. Petersburg, Florida 33733

Dear Mr. Rodgers:

This is to confirm the telephone conversation between Mr. M. H. Klineman of your staff and Mr. M. S. Kidd of my staff on September 5, 1973, relating to a meeting with you and other members of the Florida Power i

Corporation management and staff.

The purpose of the meeting will be to discuss the role of the Director l"

of Regulation and the Directorate of Regulatory Operations inspections to be conducted at your Crystal River Unit 3 plant during i

preoperational testing, startup and operation of this facility.

It is our understanding that someone on your staff will discuss your quality assurance and test program at this meeting. The meeting would be concluded with a question and answer period.

^

As agreed with Mr. Klineman, we plan to be at your office on September 19, 1973, at 1:00 p.m.

Very truly yours, o

'n g$. fh'. z.

l l

%<h Q %

/

orman C. Moseley Director i

Enclosure:

Meeting Agenda

)

J t

1

Florida Power Corporation Crystal River 3 Agenda Second Corporate Management Meeting Septemb er 19, 1973 I.

Expected Attendees USAEC N. C. Moseley, Director, Regulatory Operations - Region II C. E. Murphy, Chief, Facilities Test and Startup Branch W. C. Seidle, Chief, Facilities Operations Branch M. S. Kidd, Principal Inspector, Facilities Test and Startup Branch D. J. Burke, Inspector, Facilities Test and feartup Branch K. W. Whitt,, Inspector, Facilities Test and Startup Branch Florida Power Corporation R. E. Raymond, Senior Vice President, System Engineering and Operations J. T. Rodgers, Assistant Vice Presider.t. Generation Engineering A. J. Ormston, Vice President, Power W. A. Szelistowski, Director, Generation Engineering H. L. Bennett, Director, Generation Construction M. H. Klineman, Manager, Generation Quality and Standards E. E. Froats, Supervisor, Quality and Standards G. W. Marshall, Production Superintendent D. H. Ware, General Plant Superintendent P. G. Davis, Manager, Power Tcsting J. Alberdi Nuclear Plant Superinter. dent Babcock and Wilcox K. R. Ellison, Site Operations Manager Representatis es of Independent Contractor for Preoperational Testing Quality Ass urance To be announced.

O a

wrA-g 7., vs v w w l

~..

II. Presentations A.

Introductions - Mtiphy B.

Regulatory Operations - Moseley 1.

Role of Regulatory Operations (HQ) and Interface with Licensing 2.

Role of Regulatory Operations, Region II, and Interfaces with Headquarters 3.

Regulatory Operations' Concern for Quality Assurance C.

Facilities Test and Startuo Branch - Murphy 1.

Interface with Construction Branch 2.

The Test and Startup Branch's Inspection Program D.

Implementation of the Test and Startup Branch's Inspection Program - Kidd 1.

Discussion of Inspections as Re'lates to Appendix B 2.

Request for Brief Discussion of FPC QA Program 3.

RO's Need for Information Pertaining to the Test and Startup of t'

Reactor E.

Facilities Operations Branch - Seidle 1.

Interface with Test and Startup Branch 2.

The Operations Branch's Inspection Program 3.

Discussion of Technical Specifications.

4.

Discussion of 10 CFR 50.59 5.

Management QA Audit F.

Wrapup - Moseley G.

FPC QA Program Descriotion - FPC t

H.

Open Discussion k