ML19308D735
| ML19308D735 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/12/1973 |
| From: | Vallish E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19308D734 | List: |
| References | |
| 50-302-73-01Q, 50-302-73-1Q, NUDOCS 8003120894 | |
| Download: ML19308D735 (1) | |
Text
,
O.
o U. S. ATOMIC ENERGY COMMISSION REGION II DIRECTORATE OF REGULATORY OPERATIONS l
RO Inquiry Report No.: 50-302/73-lQ/CDR l
Florida Power Corporation (FPC) 3201 34th Street South 1
P. O. Box 14042 St. Petersburg, Florida 33733 License No.: CPPR-51 Facility: rystal River Unit 3 Descriptive
Title:
Sus ect Lack of Material Control - Weld Filler Materfal Prepared By:
/[
b/ 7e '73 E. J.Wallish, Reactor Inspector Date Facilities Section, Facilities Construction Branch A.
Date and Manner AEC Was Informed:
Licensee representative contacted Region II by telephone on January 5, 1973.
B.
. Description of Particular Event or Circumstance:
FPC had received a written notification from Babcock and Wilcox Company (B&W) stating that certain steam generators produced by B&W contained some weld filler material which did not indicate sufficient tensile or impact properties. The discrepancy was identified at the Barberton, Ohio, B&W shops during an audit per-formed by the B&W QC organization.
C.
Action By Licensee:
FPC notified the AEC Region II of the possibility that Crystal River 3 may have steam generators containing the subject weld filler material. FPC intends to pursue the subject with B&W to determine their situation.
The licensee stated that to the best of his knowledge, the above information did not contain proprietary information.
l l
l
.mJ(
i
.