ML19308D732
| ML19308D732 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/21/1972 |
| From: | Rodgers J FLORIDA POWER CORP. |
| To: | Jennifer Davis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19308D724 | List: |
| References | |
| NUDOCS 8003120891 | |
| Download: ML19308D732 (2) | |
Text
__
i
'i W
s C 0 ll P O II AT I 'V O
F L O II I D t P O W E ll'.]4 ST. PETERSDUHG FloHIDA n
U) c July 21, 1972 Unite.d States Atomic Energy Commission Directorate of Regulatory Operations Region II i
Suite 818 I
230 Peachtree Street, N.W.
Atlanta, Georgia 30303 Attention: Mr. John G. Davis Director t
Subject:
Crystal River Unit #3 l
AEC Reference P9:IIJGD 50-302 File: AEC/ DOC 2
Dear Mr. Davis:
In' reference to your letter of June 30, 1972 regarding verification of
[~T the wall thickness of valves within the reactor coolant pressure boundary as referenced in your letter, we wish to advise you that a program has been in effect at Crystal River and at our vendor's for some time to verify the adequacy of the wall thicknesses of nuclear related valves.
However, our program did not encompass all valves within the size range as stated in your letter. We have instituted an addition to that pro-gram that will identify the additional valves to be inspected. It is proposed that this identification will be completed by the 15th of August, 1972.. We will develop and qualify a procedure for wall thickness in-spe.ction utilizing mechanical and ultrasonic procedures.
It is expected that these procedures will be qualified ~at approximately the same time.
The records for inspections already completed are available for your audit at the plant site. As soon as the magnitude of the additional in-spections is determined, we will estimate the completion of this project and provide your inspectors with that information.
-I hope that this information provides you with the information you desire.
Please advise us if you have any further~ requiremente in this area.
Very truly yours, V L
/
J.
. Rodgers Asst. Vice President
, a(r
.i p )-
-JTR:mg
(\\d-cc:
M. H. Kleinman W. A. Szelistowski H. L. Bennett 8003120
[
~.
f'D
()
La to Florida Power Corporation from J. G. Davis dtd 10/27/72 Ltr to RO:II from J. T. Rodgers, dtd T/21/72 DISTRIBUTIOII:
RO, AD For Procedures RO, AD For Inspection and Enforcement L, DD For Reactor Projects RO, Chief, Reactor Testing and Operations Branch RO, Chief e
or Construction Branch RO Files DR Central iles
~
0 g
b O4
~
l c..~...
v)
(
i
.