ML19308D729

From kanterella
Jump to navigation Jump to search
Discusses Util 730620 Transmittal of Deficiency Rept & BAW-1403
ML19308D729
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/25/1973
From: Raymond R
FLORIDA POWER CORP.
To: Kruesi S
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19308D727 List:
References
NUDOCS 8003120886
Download: ML19308D729 (1)


Text

.

1 je.e.SgJ c

s y./ y. 3 3

(

n.

"~0o%.

n 'd'-

)O

' a f 0.:

.j D $

\\

  • dg'62.dsi' 1

Ocuo Florida Pw

...o....e.r June 25, 1973 s

Mr. S. E. Kruesi, Director The Directorate of Regulatory Operations U.S. Atomic Energy Commission Washington, D.C. 20545

Subject:

Crystal River Plant - Unit #3 4

Docket No. 50-302

Dear fir. Kruesi:

O On June 20, 1973, Florida Power Corporation advised the DRO Q

Region II office of our possible involvement in a situation which could be considered reportable under Federal Regulation 10 CFR50.55(e). This situation involved incomplete documenta-tion in the weld filler material records for reactor vessels, closure heads, and pressurizers fabricated by the Babcock &

Wilcox Company.

A report on the investigation of these records was submitted to the Atomic Energy Commission by Babcock & Wilcox. A copy of the report, BAW-1403, identifying our involvement will be maintained at the Crystal River Unit #3 site.

Please advise if further infonnation on this matter is required.

Very truly yours, FLORIDA POWER CORPORATION Richad E. Raymond Senior Vice President RER/iw

)

cc: Mr. Norman Moseley

(',/

Director, Region II 8003120 N 6 General Office 3201 wty-rourtn street soutn. P O. Box 14042. St. Petersburg, Florida 33733 813-866-5151