ML19308D358

From kanterella
Jump to navigation Jump to search
Forwards LER 78-002/03L-0
Date released: 11/18/2019 Download: ML19308D358


LER 78-002/03L-0:on 780104,one Cable Tunnel Sump Pump Failed to Start During Operability Verification.Caused by Packaged Sump Pump Electric Motor Portion Failure.Pump Replaced
ML19308D364
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/26/1978
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D364 (2)
Forwards LER 78-002/03L-0
ML19308D357
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/27/1978
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D357 (1)