ML19308D327

From kanterella
Jump to navigation Jump to search
Forwards RO-77-58
Date released: 11/18/2019 Download: ML19308D327


RO-77-58:on 770607,operability of Motor Driven Emergency Feedwater Pump Flow Path Found Not Verified within Time Limit.Caused by Error in Evaluation of Performed SP-349. Shift Supervisors Instructed Re Sp Requirements
ML19308D328
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/30/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D328 (2)
Forwards RO-77-58
ML19308D326
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/30/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19308D326 (1)