ML19308D283

From kanterella
Jump to navigation Jump to search
Forwards RO-77-27
Date released: 11/18/2019 Download: ML19308D283


RO-77-27:on 770405,purging of Reactor Bldg Occurred W/Reactor Bldg Purge Radiation Monitor Vacuum Pump Inoperable,Contrary to Tech Spec Requirement.Caused by Conflicting Tech Spec Requirements.Tech Specs Conformed
ML19308D291
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/12/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D291 (2)
Forwards RO-77-27
ML19308D282
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/12/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
Download: ML19308D282 (1)