ML19308D217
| ML19308D217 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/18/1977 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19308D218 | List: |
| References | |
| CS-77-31, NUDOCS 8002270679 | |
| Download: ML19308D217 (1) | |
Text
.
d @, -Q, e e,.oQ,9}
gygsn0E1 y&Mo
.h'SY,
o' '**
4y,,ornir:
-Florida 18 February 1977
'N co =,o a e.o= Pow r 3-o-3-a-1 p
FEB 28 tg775 l
e CS-77-31 9 sia,%
,j cc.om.%,,,,, j e
ua
/
4 re Mr. Norman C. Moseley, Director Docket No. 50-232 Office of Inspection and Enforcement License #DPR-72 U. S. Nuclear Regulatory Commission Licensee Event Report 77-14 230 Peachtree St.,
N.W., Suite 818 Atlanta, Georgia 30303
Dear Mr. Moseley:
This report is submitted in accordance with Technical Specification 6.9.1 and Regulatory Guide 1.16, Revision 4, Section 2.b. (3) as a e written Thirty (30) Day Report.
Review of surveillance test procedure results determined that the Crystal River Unit I station battery did not meet acceptance critetia in that. specific gravity was below 1.20.
Redundant sources of emer-
[n) gency power were available and demonstrated operability.
Upon dis-(j covery, the battery was charged and tested satisfactorily.
Corrective action was implemented in accordance with the attached Licensee Event Report.
No safety implications resulted.
Very truly yours, FLORIDA POWER CORPCRATION f) 3
'.O D
L0 f
W. P. Stewart Director, Power Production nup/ feh Enclosure Nuclear Plant Manager 2081 n
(U}
8002 270f General Of fice 320i inirty-fourin street souin. P O Box 14042. St Petersburg, Ferida 33733 813 -866-51Y
'