ML19308D085

From kanterella
Jump to navigation Jump to search
Forwards RO-77-18
Date released: 11/18/2019 Download: ML19308D085


RO-77-18:on 770216,Westinghouse Pressure Transmitter 59PH Failed to Demonstrate post-accident LOCA Performance Capability.Caused by Moisture Leakage in Terminal Box. Transmitters Will Be Replaced W/Rosemount Instruments
ML19308D093
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/02/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D093 (3)
Forwards RO-77-18
ML19308D084
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/03/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
Download: ML19308D084 (1)