Discusses Facility Test Program Mod Review,Necessitated by Reactor Coolant Pump 2a Clutch Failure
ML19308C913
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/15/1978
From: Tracy Scott
BABCOCK & WILCOX CO.
To: Rogers L
BABCOCK & WILCOX CO.
References
TASK-TF, TASK-TMR NUDOCS 8002070662
Download: ML19308C913 (3)


Text

_ _

SITE INF~RUCTION NO. _.A[l.E.._ __

v v

DISTRIBUTION _

b THE BABCOCK & WILCOX COMPANY NO I.' ESPONSE REQUIRED l

POWER GENERATION GROUP

,y,,,. g,

...O P SIGN TURE E_ _.

To l L. C. Rogers - S'ite Operations Manager, Th'ree Mile Islan'd 2W

/

c-APPROVEDiH.

__f. :....

.]lll))

From T.

Scott - Plant Startup Services Section (Ext. 2519) g sos 662.5 Cust. TMI-2 g

F 620-0006/T3.4 Su bj. Test Program Modifications Date March 15,1978 l

m.i...................

....w The test prog am for TMI-2 has been reviewed for modifications which may be necessary due to the failure of the RCP 2A clutch. These reconnendations assume that RCP 2A is restrained from rotation and only address the test program through the completion of zero power physics testing. The power escalation sequence test program recommendations are being developed separately.

1.

B&W has no objections to performing zero powe'r physics testing with three reactor coo ant pumps operating.

2.

OTSG special testing which requires four reactor coolant pump operation should be performed as soon as practicable after four pumps are available.

3.

Control rod drive trip testing at hot conditions should be conducted with three pumps operating. The acceptance criterion should be changed to require trip times of less than 1.32 seconds. This value has been developed for 177 FA plants with no reactor coolant flow, hot conditions and is con-servative for three reactor coolant pump operation.

Experience has shown tnat this criterion can be met under normal four pump conditions. We do not feel that trip testing would have to be repeated under four pump condi-tions if this were acceptable to the NRC.

4.

Reactor coolant system pressure control should be selected to the loop with two pumps operating.

5.

Reactor Coolant System flow under steady state three pump conditions should be measured. The acceptance critorion is that total core flow rate be l

between 302,900 and 285,600 gpm (A + 2.5% uncertainty has been accounted l

for in the flow rate). When four reactor coolant pumps are available, the l

test should be repeated with the normal four p;mp acceptance criteria.

l l

6.

Reactor Coolant System flow coastdown should be measured during a three-l to-zero coastdown. The acceptance criterion is that measured total core flow rate at 532 F be above the curve defined by the following points:

l l

8002070[

W

d D*,

V L. C. Rogers March 15,1978 Total Core Flow Rate Time (sec)

MPPH @ 532 F 0

106.0 1/2 105.0 1

103.0 2

96.5 3

90.0 4

83.0 5

76.0 This curve was the acceptance criter. ion used for the three pump coastdown at SMUD. A four to zero coastdown test should be performed as soon as four pumps are available.

7.

Since the pressurizer spray flow was set during Hot Functional Testing, ne additional checks or adjustments are necessary.

Experience has shown that the HFT setting is acceptable.

TFS:NF cc:

J. R. Bohart T. A. Brandsberg R. J. Finnin W. R. Gray D. F. Hallman J. R. Lojek W. E. Perks L. R. Pletke W. H. Spangler G. K. Wandling REVIEWED FOR ACCU.7ACY F//h6

.' W ENGINEERING:

M DATE:

son NUCLEAR SERVICE: hk DATE:7// g R. W. Winks Central Files REVIEWED FOR ACCURACY ENGINEERING: TA(

DATE: 3/a/77 NUCLEAR SERVICE:g.-[ ]l{

DATE:Jf g REVIEWED FOR ACCURACY ENGINEERING:

A.' 3.ga./

DATE:

NUCLEAR SERVICE:

-~

DATE:

l

}. S.0%

3[t s(%

v m i - 2.

oTsc, i u s r.

r%w ewAR i

i

W e x.=a n a-,_,_~is ".,6e-cM N>...a ~~

M

.x.sn~w-ss-a f G 30306 Y'

l_. C. A o 4 e n

( O 11 )

T.YSc00 R

O O

rly1r-7T dt/2-6) f%4ShivP "d'*5 N"N^

5 M

l

$wS A(7 CA TE S&6Jisa Test Peccasm irld*c ns ll1aau ir iew l

.m. _....- m nSt heQ.LI O

GS 6

i e

1 m

$f f

0 CAf t l'OMG

  • O O D 0,O ]

m.

,s m

,^.

s 3

nFh;PN in COPY TO SENDE.

Mt I,i

.[ ] j,;,I g

.