Text
O
\\'n
-
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
g'
$
-
- E
REGION ll
o,
[
101 MARIETTA ST., N.W., SUITE 3100
.....[
ATLANTA, GEORGIA 30303
NOV 2 61979
In Reply Refer To:
RII:VLB
50-321/79-33
50-366/79-37
50-424/79-16
50-425/79-16
.
Georgia Power Company
ATTN:
J. H. Miller, Jr.
'
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by V. L. Brownlee of this office on
November 5, 6, 8, and 13, 1979, of activities authorized by NRC Operating License
No. DPR-57, License No. NPF-5, and Construction Permit Nos. CPPR-108 and CPPR-109
,
for the E. I. Hatch Nuclear plants and Vogtle Nuclear facility, and to the discus-
sion of our findings held with W. A. Widener on November 6,1979 and R. W. Staffa
on November 13, 1979, at the conclusion of the inspection.
Areas examined during the inspection and our findings are du. cussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent. to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Pract. ice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprieta ry, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
8002010N
-
L
.~
.
.
NOV 2 61979
Georgia Power Company
-2-
i
Should you have any questions concerning this letter, we will be glad to discuss
them with you,
t
Sincerely,
N"f
.
C. E. Murphy,' CiIib'f
Reactor Construction and Engineering
,
j
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/79-33,
50-366/79-37, 50-424/79-16 and 50-425/79-16
cc w/ encl:
i
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
,
C. E. Belflower
'
.
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
W. A. Widner
Manager-Nuclear Operations
Georgia Power Company
'
Post Office Box 4545
-
Atlanta, Georgia 30303
K. M. Gillespie,
'
Construction Project Manager
P. O. Box 282
Waynesboro, GA 30830
E. D. Groover
QA Site Supervisor
,
P. O. Box 282
Waynesboro, GA 30830
'
D. E. Dutton
Project General Manager
Georgia Power Company
'
Post Office Box 4545
'
Atlanta, Georgia 30303
,
'
.
l'
,
,
.-
, . ~ .
-
-
-
-
.