Forwards Proposed Bulletin Re Incorrect Positioning of safety-related Valves.Bulletin Should Be Issued
ML19308C297
Person / Time
Site: Crane 
Issue date: 03/21/1975
From: Okeilly J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19308C291 List:
References
TASK-TF, TASK-TMR NUDOCS 8001220667
Download: ML19308C297 (3)


Text

..

.p..

UNITED STATES NUCLEAR REGULATORY COMMISSION REGloN I

$11 PARK AVENUE g

fh[$

KINC OF PRUSSI A. PENNSYLV ANI A 19406

\\...

Sent Facsimile to F. Dreher, 3/21/75

~'

H. D. Thornburg, Chief, Field Support and Enforcement Branch Office.of Inspection and Enforce =ent, IE:HQ PROPOSED BULLETIN - INCORRECT POSITIONING OF SAFETY RELATED VALVES (TRACK F14088HO)

It is reco== ended that the attached draft IE Bulletin be sent to all licensee's.

Those with OL's for action and those with CP's for infor-mation.

'a'e have recently received eight (8) abnormal occurrences desevibing instances in which safety related instrumentation was in-advertently valved out of service. It is our view that this matter is of sufficient importanc to merit the issuance of a Bulletin.

/p9,* / /-v /,?

,[

~

3 i

(???Ac")G James P. O'Reilly g

Director

Enclosure:

. List of AO's relating to instru=ents valved out of service D

9 O

- + --

8001220 6 7

9 BULLETIN PROPOSAL

\\"

Inspection and Enforcement Bulletin 75 March

, 1975 0

INCORRECT POSITIONING'0F SAFETY RELATED VALVES 0

Descriotion of Circumstances We have received several abnormal occurren'ce reports which identified instances.when safety related instru=entation was valved out of service.

In one instance high dryvell pressure instrumentation isolation valves at containment vessel penetrations were closed.

In another instance an instrument was valved out for maintenance during a shutdown and the reactor was restarted without the instrument being returned to service.

Action Recuested of Licensees In light of these type occurrences you are requested to take the following actions. Upon completion of these actions you are requested to inform this office in writing, within 90 days of the date of this letter, of the status of each ite= listed below.

A copy of your report should be sent to the I&E Assistant Director for Operations and Construction.

(

Instrumentation and Other Safety Related Valves In The Reactor Protection and

'~

Engineered Safeguards Systems a.

Procedural Review 1.

Conduct a review of operating, maintenance, testing and I&C procedures to determine that procedures exist that clearly identify the correct position of all instru=entation valves in safety related uses.

NJ\\

2.

Verify that checkoffs are included in procedures to assure that each valve is properly aligned.

Procedural signeffs (in.cluding dates and ti=es) by personnel performing valving must be used where appropriate.

b.

Management and OA Controls l

l 1.

Conduct periodic review of the system that assures that there are sufficient checks to verify that valving is and remains correct during the conduct of license activities.

'2.

Assure that necessary steps are being taken so that personnel authorized to perform or to maintain the positions of safety related valves are adequately trained to carry out assigned responsibilities.

3 s

.g>

s

/

D' CLOSURE Abnormal Occurrence Reports relating to incorrect positioning of

. Safety Related Valves.

1.

Peach Bottom 2 and 3 50-277/278-74-C-1 2.

Peach Bottom 2 50-277-74-36 4

3.

Peach Bottom 3 50-278-74-10 4.

Vermont Yankee A0 06 5.

James A. FitzPatrick 50-333/75-29 I

6.

James A. Fit: Patrick 50-333/75-24 7.

Peach Bottom 2 50-277-74-55 8.

Peach Bottom 2 50-277-75-21

[

t t

/

D

- t.

I I

l>!

^

I

.I l

I q

V 1

m.

,o e,,

g, e

- - -