July 10,1979 MEMORANDUM FOR: All Special Inquiry Group Menbers
@g FROM:
George T. Fragton, Jr., Deputy Directo j
I NRC/TMI Special Inquiry Group J
SLBJECT:
DRAFT OUTLINE OF REPORT Attached is a first draft of an outline of our report, constructed so as to focus attention on the issues and questions that may need to be addressed. This should be regarded as a work in progress, to be revised as wq go along.
Some of the subsections in *.his outline con-tain lists of specific items. These liets are not meant to be definitive; to the contrary, they ve illustrative purposes only, so that in succeeding drafts we can begin to supply more accurate and cogrehensive lists of the specific design deficiencies, specific regulatory de-ficiencies, etc. that the Report will ha.e to discuss.
~~
George T. Franton, Jr., Deputy Director NRC/TMI Special Inquiry Group
,f
,$ c? bll b 'b
- f' %
Yi
(
p
~ '
/' '_
r, 7, 7. '
,/ p, o o l
^
p-
- d
- j r
I s -../.
,,_hf l
../
so
/
t-
- 0121o 3gy n 4
Outline of Report / List of Possible Issues To Be Addressed NRC Three Mile Island Special Inquiry t
I. INTRODUCTION Brief discussion of NRC t decision to institute a Special Inquiry under outside, independent supervision. Description of the group t mandate, scope,make-up, methods enployed in the study. (List of staff to be
)
supplied as an Appendix).
rffi. j c I ',
II.
WIAT HAPPENED?
..g4 W
ap #h M s 3$, M '
1.
Narrative
/)'"
This section will be a substantial part (
1m_
n-quarter to one-third) of the report and will contain tail integrated, narrative f
r account of the accident from 4 a.m. on until at leas p x d g (c) 3 later.
The narrative will integrate and conbine the following ini.v a
^
e s
single aa:ount:
i,t7 f
.1 1
The physical sequence in the plant, including operator actions causing these physical events to occur. (T_his will have to in-clude an interwoven account of how tem, react 6r workgs!T~
1.2
' he utility S response.
- /
' 4 1.2.1 Operator actions (overlap with 1.1 above; this I
will require clarification of responsibility between Task Groups 1 and 2).
1.2.2 Decisions and actins by utility management, in-A-
cluding nake-up and actions of 'various ad hoc I
groups formed by management, utility t conmuni-cations with NRC, B&W, other utilities, its I
communications with the state and with the press.
Y'
. 1.3 NRC t response: this will be a description of what NRC personnel actually did. For the next draft of this outline, we need a more accurate and comprehensive list of the major contributing NRC conponents; a tentative suggested list of components whogerole should be described follows, for comment and critisicm:
1.3.1 First teams of inspectors to arrive on 3/28; how did they perceive their role and authority; what was their expertise; what did they do?
1.3.2 First NRR team (Vollmer), arriving 3/29.
1.3.3 Designation of Denton as President t delegate, his arrival on 3/30, establishment of on-site NRC command post.
1.3.4 Region I Incident Response Center
.3.5 Bethesda Incident Response Center 1.3.6 NRC HQ backup staff 1.3.7 Office of State Prograns 1.3.8 Connd ssioners 1.3.9 NRC t liaison and connunication with other federal agencies.
NOTE:
We want to isolate and devote our energy to the major NRC individuals and conponents that played a role in the accident.
In other words, we need to make some early choices about less-relevant fact-gathering re NRC response that can be.given low priority in the inquiry (such as, how ney people in all " played some role," where they were located, etc.).
1.4 Responseofthestateandotherfederalagencies.fbrthenext draft, we need a list of state offices and agencies, and of other federal agencies, with short descriptions of their re-sponsibilities, capabilities and their roles in this accident.
i
7
!" f 9.a i (H.)/ML O
(,
/
J 1.5 Radiological releases
/
1.5.1 What kinds of radioactivity does a reactor produce in normal and in failure conditions? How are these types of radioactivity dangerous, and in what doses and circum-7 stances?
- 'q g,
y 1.5.2 What kinds of radioactivity were probably produced in this accident?
1.5.3 Through what patNays did the radioactivity probably escape, when and in approximately what concentrations?
a
. ~ ~,
g'[
1.5.4 What is the best estimate of the doses and exposures received (a) in the plant, (b) on-site, and (c) off-site as a result?
1.5.5 How were these doses and exposures measured and calcu-lated? What are the bounds on the estimates?
1.5.6 Estimates of danger to health and safety from these doses and exposures. Bounds on the estimates.
A nunber of specific natters need to be covered in this narrative section, either interwoven in the nar ative or possibly set forth separately in conclusory sections.
Waile in some cases these matters are part and parcel of 1.1 through 1.5 (indeed, in some cases they overlap each other), they are separately listed below so that we can identify which matters will be evered by which Task Groups and individuals within Task Groups:
/
t 1.6 What were the r %r strategy decisions (or non-decisions) affecting V@
the status of '.;w 'lant or releases, how were they nade, by whom, and on what batis? For the next draft of this outline we need o.
more accurate list; a few illustrative items are suggested below to provoke conr and begin conpilation of such a list:
1.6.1 The 5:30 a.m. conference call on 3/28 m
/?f T d'
,5 s
/
1
(
. 1.6.2 The a.m. decision cn 3/28 to blowdown the system.
1.6.3 The decision in the late afternoon of 3/28 to repressurize How did this decision get made, by whom; who had input?
1.6.4 Decision resulting in 1200 MR release at 6 a.m. on 3/30.
1.6.5 Etc. -- we need to add or subtract as appropriate.
1.7 What were the decisions concerning evacuation? When were they made, by whom, and on what basis? For the next draft of this outline, we need a summary account of major points when evacu-ation was raised, argued for and ordered. (e.g., 3/30 partial evacuation; was there a decision on Sunday by four NRC Conciss-ioners to recommend evacuation, the Chairman?)
1.8 How bad was the accident and how much worse could it have been?
/.8.1 What could or should have been done to stop or ameliorate 1
f/
the accident? What was the " anticipated" procedure 9
l1 and why didn t it work?
1.8.2 What could or thould hae been done to stop or amelio-rate the releases? On-site exposures? Why wasn t this done?
1.8.3 How severe was core damage, when did it occur and how?
gu When was this known? Generally recognized? When should it have been known?
rgu 1.8.4 Was there a hydrogen bubble and when? What danger did it in fact pose?
If the bubble was incorrectly perceived as a significant danger, why did this occur? Where there other scenarios incorrectly l
perceived to be potentially dangerous?
i
. p.
1.8.5 Alternative sequences:
What might have happened g:
y 1.8.5.1 The reactor had failed to SCRAM?
m 'dd.
1
~
l
\\
o t
')
{.' Y n
-.,; ( p-[ c_,
j
. \\
1.8.5.2 RC punps had not been successfully restarted?
1.8.5.3 PORY had not been isolated? (i.e., small break LOCA).
1.8.5.4 Off-site power had been lost?
{
NOTE: Above list is illustrative only.
In the next
\\
draft of this outline, we should specify which alternative sequences we will consider (in-cluding aneliorative sequences).
~~ -
1.8.6 How close did TMI-2 core to a more serious core meltdown cifY and greater releases of radioactivity?
1.9 What infornation was connunicated to the public (in the form of official statements, press releases, press conferences) by the various parties, and how did this information jite with the facts.
If inaccurate, why was it inaccurate?
1.10 What was the "socio-economic" effect on the population living in the area of TMI-2?
1.11 Is there any evidence of sabotage? Of bribery 3(i.e., somebody being paid pff to overlook or approve faulty or dangerous equipment?).
1 i
l l
'a9 e
9*
p i
- II.
2.
Did TMI-2 have any design deficiencies that contributed to the accident?
If so, were they (a) unique to.this plant, (b) charac-
'/ w' teristic of all similar plants, or (c) characteristic of all or i most nuclear power plants?
Possible types of design deficiencies are roughly grouped in five l
categories below; the exagles given in each category are illu-strative only, and for the next draft of this outline we need to produce a more valid list of possible (or alleged) design defici-encies worthy of our attention and/or coment in our Report.
2.1 Plant systems deficiencies.
Possible exagles:
/,. v.:/
Inadequate [ppimsty coolant inventory 2.1.1 A
.1.2 m
2 Use of U-bend loop in primary system where steam
'/
3 bubble can arrest natural circulation.
D' 2.1.3 Use of EMOV t in addition to code safety valves (was this in part an attent to prevent SCRAM and
)7/
s/
resultant down-time?)
2.1.4 RHR not designed to operate at system pressure.
/t 2.1.5 Etc:
Are there possible design deficiencies we need to I
consider in the radwaste system? HPI? Auxiliary feed System? OTSG?
/ ry f:
,y 9,
w w
2.2 Comand and Control deficiencies. Possible exagles:
\\
2.2.1 No reactor trip on turbine trip 2.2.2 No containment isolation on high radiation alone 2.2.3 No automatic signal to unblock auxiliary feedwater I
mo,torized blok valves.
I 4
Q.
33 ;u: pr.
L. ',,w i
y 2.3 Instrumentation deficiencies.
Possible examples:
./
e O
I I
i,
2.3.1 Inadequate (" missing") instrumentation:e.g., No
)
level indicator for reactor vessel.
j 2.3.2 Instrumentation with ranges not adequate for ab-normal conditions: e.g., thermocouple displays; various in-plant radiation monitors.
I 2.3.3 Inadequate coquter or print-out facilities.
especially for real-time reporting in accident situations.
,,A '
AL h6 v:v e k-G Q ' 2.4 Sagling and monkoring deficiencies (TLDs; on-site real-
,p time monitors) d\\
f, 2.5 Human factors deficiencies. (This category has some overlap i
, h? '
with both 2.2 and 2.3 above, insofar as it includes failure
-\\y to "desirn" command and control systems or instrumentation or e'
instrume1tation displays with human limitations and the possi-b' s dl bility o f human error in mind.
Furthermore, to answer the
.dk
'j question whether any human factors deficiencies contributed
/
to the accident, reference will have to be made as well to the
/'
6., ysis of the contribution of " operator action" discussed in anal below.)
- 7 y..
j 2.5.1 Poor Control room design.
x..
? -
With respect to any " design deficiencies" identified in the
. {P 1
above categories, we will have to answer the following questions:
- h'.
2.6 Was the deficiency, problem or issue raied in any forum, and
- s' v?
should it have been? Specifically, with respect to each system a \\x.
or co@onent identified as having a design deficiency: who
'G".; i took the lead role in designing it, what kird of analysisJd44 da.c.,
7 what was NRC t role, did the matter come up in any licensing
?
review process or appear on a "Unresolvad Safety Issue" list, how was it resolved, was the resoltuion proven incorrect?
, ;' \\, O
'\\
2.6A Sonewhere here -- possibly either before or after the above section 2.6 -- we will need a descriptc., of NRC t licensing p,.,-..
G 4
process as it is supposed to work and as it acuta 11y does
)
work (or not work); and a description of the NRC % phTTos-ophy of sjtfaty. In7hort, a description of wn1t thTNRC qt
- aces and does not do.
N,,
fY.
2.7 To what extent are any identified design deficiencies attri-
..Y buted to defects in NRC t basic philosophy of safety or the method of application of that philosophy (e.g., W the design basis l
.. ', accident approach, fault tree risk assessment, etc.)
,t /
.s
.8 To what extent are any deficiencies attributible to defects in 40 NRC t licensing and review process? Some of the questions that I
/
might be covered here that are not immediately obvious from the
/
above outline (we invite additional suggestions for the next draf t) include:
2.8.1 Why was the choice made not to analyze and design better j
against small loss-of-coolant accidents? Why weren i transients better studied and simlated?
2.8.2 Was there adequate planning for the effects of an accident involving significant core damage?
2.8.3 Why was the presence of noncondensible gas in the primary system sitch a surprise to NRC?
q
[
2.8.4 Was control room design and isntrumentation adequate?
/) )
To what extent was human factorttechnology used in the q
development and design of the control room? How does de.Thl4,
/
/
cf.R co@are with human factors standards? With design
'f concepts used in co@ arable control rooms (NASA; D0D; i
s l
chemical industry)?
j l
2.8.5 Was adequate attention focused on the probability of human error and the control thereofMpecifically,on
'mV any kinds of human error that may have played a role in I
this accident?
2.9 To what extent are any identified design deficiencies
. \\,)
attributable to failings by the vendor
,e.g., faulty or l
- s./
s:
dN fraudulent analysis).
1 I
- e
._y.,..,.
4 2.10 To what extent are any design deficiencies attributible to q\\'.f ',<.,,
failings by the utility?
R Q
2.11 Can we draw any conclusions about the adequacy of NRC %
" safety margin" from any such deficiencies? Why was this e
q-
/[ Q) V,,
accident "not a credible event"?
3.
Were there specific events or experiences at TMI-2 or at other plaats' that should have alerted NRC or the utility to the potential for such an accident?
If so, how was information about these events nandled, who knew about it, and why wasn t appropriate action taken?
A list of such events should be supplied for the next draft. We understand the list might include some of the following:
3.1 Similar occurrences in 1975 and 1977 (Davis-Besse).
3.2 Michelson memo of 12/77, Pebble Springs question.
3.3 Israel to Novak memo of 1/78 3.4 Cresswell % coglaints; Cresswell memo of 1/79.
3.5 Operating experience: failure rate of PORY t.
3.6 Were there any precursor events or hints of problems in the operating history to TMI-2?. What was experience with prior turbine trips?. Loss of feedwater?
Were there reco//? 9 YUP mmendations arising out of previous accident 3.7 experiences that were not carried out, and that might have helped prevent or ameliorate this accident? (E.g., any lessons from the Brown i Ferry fire, such as identified lack of lead responsibility for coping with th( accident)?
3.8 If precursor events went unheeded, what conclusions can be drawn concerning NRC % and the industry t failure to evaluate prior operating experience (f~ exagle, possible NRC failure to analyze and act upon LEkt) in a manner sufficent to identify safety problems and cure them?
O
.......__.<,._v...
. If the NRC $ perfornance in this area has been deficient, can we identify reasons why is has been?
4.
Were any specific regulatory requirements, technical specifications, equipment standards, or safety procedures that could or should have k,
been applied to TMI-2 but were not, which might have prevented or ameliorated the accident?
NOTE: This section may overlap to some extent with Section 2.,
on design deficiencies, since presumably identificatiori of a design deficiency might have led to instituting a new regulatory requirment, or specific safety procedure, to deal with it. However, the nein intent of this section is
~
to focus on relatively concrete, detailed specific items:
if equipment failed, does thtt show that it should have been required to be safety grade? Would better shif t turn-over procedures have prevented the accident? Would inclusion in the tech specs requirements for actuation (alarm) upon certain specific events have helped? The section also looks at a set of possible reasons why such requirements weren t in place $
grandf athering; granting of any exegtions to TMI-2: etc.
0 4.1 Were NRC t equipment standards adequate? NRC t standards for q.h vendor or utility QA Programs?
4.1.1 Did the failure of equipment contribute to the accident?
4.1.2 What were NRC $ requirements for such equipment?
Should the requirments have been higher?
If so, what conclusions can be drawn about why the regulatory process did not work to igose stricter requirements.
NOTE:
In section 4.1.2 we will need a discussion of the concept of " safety" as opposed to "non-safety" equipment, and how valid the distinction
'lf e DA'f^,k&.w yu 4v.2/
To what extent can equipment fai,G,re be traced to ' defects 4.1.3 in the quality assurance program of the vendor? How does the NRC oversee or regulate qualiy assurance? Can we draw any conclusions from equipment failure in this accident as to whether such regulattens are adequate?
4
/
4.2 Were there any procedures that were not required by the NRC that might have prevented or ameliorated the accident?
gA.
What follows is an illustrative list only; for the next
'S \\
draf t of this outline, we will need a more accurate, compre-
..\\ ', /
hensive list of any and all procedures we can now identify that
,[y,'/
might have been deficient and that might warrant attention and/or discussion in our Report:
j
[x
[ 4.2.1 Shif t turn-over procedures v
a q
b
' 4.2.2 Checklists and sign-off procedures for surveillance
.E
./
of routine maintenance.
dr k 'I E.
4 I
4.2.3 Better procedures for responding to certain acci-
\\I dent situations.
J' 3 4.2.4 Health physics procedures or requirments I'
p, 4.2.5 Etc.?
$ 4.3 Were newer plants subject to requirements (e.g., under the h
standard safety review plan, adopted after TMI-2 was re-viewed) that might have had an impact on this accident?
If so, what conclusions can be drawn about NRC t " grand-fathering" approach to safety and about the " ratchet" mechanism NRC uses to implement that approach.
NOTE:
In section 4.3 we will need a factual description of how the ratchet process works and how decisions whether to retro fit are usually made.
4.4 Were there any specific exegtions or amendments granted to TMI-2 by NRC that had an igact on the accident?
4.5 Were there any new research projects or projected standards not yet iglemented that might have made a difference?
4.6 Were any specific issues raised and contested in the licensing process that might have made an igact?
1 G
4
-11 A-4.7 Should the need for these additional standards or procedures have been foreseen? If so, why weren t they implemented before?
Is this attributible to failings in the NRC licensing and review process? To utility NEnagement? Io,the vendor?
5.
Did any deficiencies in the status or condition of the plant --
s whether or not they constituted " violations" of the license or NRC regulations -- contribute to the accident and/or releases of radiation and exposures of on-site personnel?
NOTE: To sone extent this section will overlap with both 2 and 4.
However, it is the intent of this section to ask whether, even assundng the design was adequate and regulations were adequate, there were conditions in the plant that did not meet the regulatory require-ments, or leaks or other conditions that simply were-S S
6 l
- es.
1 4
never intended to be covered by NRC regulations (v WM : 7) that in hindsight contributed to the accident. Of course, the existence of any such conditions might support a conclusion that stricter requirements should have been in place to prevent the conditions, thus putting such conditions into Section 4.rather than this section.
5.1 Physical deficiencies. The list that follows is not meant to suggest any conclusions, but is illustrative; for the' next draft of this Outline, we need a more accurate list of the items that might fall under this category:
\\r n 5.1.1 Clogged condensate polisher
/
5.1.2 Block valves for auxiliary ftJwater closed at start of accident.
5.1.3 Lee.ks in make-up and let-down system.
5.1.4 Clogged filters on make-up systems punps.
5.2 Inadequacies in the health physics program.
Here, too, we need a list of potential matters to be looked into; we understand at this time that the list might include some of the following:
5.2.1 Inadequate procedures and planning
/
5.2.2 Inadequate training 5.2.3 Etc.?
5.3 Insofar as any deficiencies are identified in the above sections, do these deficiencies indicate:
5.3.1 Violations of regulations?
5.3.2 Inadequate NRC in.ipection or enforcement 5.3.3 Inadequate NRC standards and requirements? (If so, then this would be an overlap with section 4 above).
l l
T
. 5.3.4 Inadequate naintenance by the utility?
5.3.5 Inadequate procedures by the utility?
5.3.6 Poor unufacture or quality control by the manu-facturer? (If so, this would raisequestions set forth in 4.? above).
5.3.7 To what extent do any deficiencies result from the utility being permitted to cut safety corners in order to rush the plant into "comercial operation" by the end of 1978.
Specifically, what tax, rate or other ad-vantages accrued to the utility from going commercial on the last day of 1978, if any, and what efforts were made to meet this dead-line?
6.
What role did operator involvement (and supervisory management of 3
3
(
the operators) play in the accident?
NOTE:
In this section, the operators and their involvement in the accident will be discussed. This will include
~
j operators training, crew relection, operator qualifi-
/
cation, etc, as well as the affects of crew shift, sy fatique and so on. The following is a list of questions that may have to be addressed at one or another points during this inquiry.
\\'
NOTE: There is potential for overlap between this section j
and the portion of section 2 that deals with inadequate
/
design for human error and inadequate instrumentation.
.//
There is also potential for overlap between this section
/r and section 4, insofar as & deals with inadequate require-ments (which arguably could include inadequate requirements s
for training, operator qualification, etc.) and inadequate procedures (which arguably include procedures to guard against operator error).
It is our tentative intention to try to use this section,5esU I
6, to deal as noch as passible with all of the questions relating to the operators
- role: 1.e, to identify and y~ discuss deficiencies relating to opei4 tor qualification, operator eduction, operator training, operator licensing, requirements for control room sanning, crew couplements, f
how shift crews are selected and rotated, role of engineers
[ in the control room, the need for more specific operating procedures or manuals in the event of variotg accidents or We will try to use the design deficiency
.h, transients.
section (section 2) to talk about inadequate instru-I mentation, inadequate control room design, and lack of human factors engineering.
We will see how this division of attention works as we go along.
i O
' 4, 6.1 Did operator error contribute to the accident? If so, at what points, and why were those errors mde as best we can determine?
/y 6.2 Did the operators have insufficient instrumentation to make the correct decisions?
'] -
6.3 Did the operators have sufficient information but fail to obtain it, or fail to rely on or believe it if they obtained it? Why?
q 6.4 Are qualifications for operators sufficient?
6.4.1 Describe educational qualifications, licensing procedure and requirments for reactor operators.
Describe type of person who usually serves in an l
operator position.
6.4.2 Are these reequirments sufficient to guarantee
- j that an operator will have the ability to run a plant safely? If not, why not?
6.5 Was operator training sufficient?
c-r. m >
l
' 78 6.5.1 Describe' training requirements and actual training, generally and in the case of these operators.
A i h 6.5.2 Was the training adequate to permit response to this emergency situation? Did the operators in fact c
follow their training? If so, with what results?
If training wa: inadequate, what improvements or changes might have been made that would have pre-vented or ameliorated the accident.
e U)) 6.6 Were there adequateirocedures in the control room for this kind of accident? 'What procedures, if any, were followed?
r 4
SG"JD.
s
-. 6.7 Should additional technical expertise be regularly in control rooms? Among questions to be addressed here might be.
What is the existing philosophy of operator responsi-bility in controlling the plant? Does it place an undue burden on the operators? What role do supervisors play?
[y Should there have been a highly qualified engineer available on this shif t -- ie., would that have nede a difference?
t I
l Did the operators rely insuffficnelty on automatic systems?
6.8 l
6.9 Is there evidence that lack of understanding of the control I
room or features of the control room played a role in the accident?
(Thius overlaps with portions of section 2.,
above).
6.10 Did the physical and mental conditions of the operators play a role in any identified human error? (Questions to be asked may include how long the shift had been together, how many days they had worked previously, whether there were enough men on shift, the time of the accident, whether the shift worked together well, whether individuals were physically or mentally fatigued, whether outside influences (family financial, comany problems) may have contributea adversely
'to their conditions, whether any were under unusual stress situations or reacted poorly to stress.
6.11 How od was this shift?
,g, e ea O
..... N. '. L N...
. 7.
Was the planning and response of the NRC for such an accident adequate?
7.1 NRC t response plan and planning.
What equip-ment, etc. was actually in place.
What is the NRC t anticipated role in an accident?
7.2 Summarize briefly the actual response of the NRC which will have been set forth in detail in the narrative in Section 1.
7.3 Was the NRC % plan followed?
7.4 How effective and helpful was the response.
Evaluate the usefulnes of each NRC component listed in Section 1 7.5 How effective was NRC in coordinating with other federal agencies? The state? The utility?
7.6 Identify reasons, if any for lack of more effec-tiveness NRC role.
Suggested possibilities are listed below for feedback:
7.6.1 Inadquate legislature authority?
7.6.2 Lack of manpower?
7.6.3 Poor connand and control, poor management?
7.6.4 Poor connunications?
7.6.5 Inadequate technical resources?
7.6.6 Poor planning?
7.6.7 Poor coordination with utility? With the state? Other federal agencies?
~'c 7.6.8 Poor coordination with State or other federal agencies?
t a
e h
. 7.7 In light of the above, how adequate was NRC t planning?
7.8 What should NRC t role be in an accident and how can it plan correctly to fulfill that role?
E.g., can NRC "take over" a plant? Does a SWAT team make sense?
8.
Was the utility t response to the accident adequate?
8.1 Describe the utility i plan.
Equipment in place, training, etc. Did it meet NRC requirements, if any?
4 8.2 Summarize actual response from narrative above.
8.3 Was the plan followed?
f 8.4 How effective was the response?
8.5 What factors prevented the response from being more effective?
8.6 Evaluate the planning in light of (5.4 4bert -
3 NOTE: Aspects of the utility t response that might be considered include:
(a)
Initial operating crew (b) Alerting State, NRC, plant (c) Contacting superiors (d) Management hy Upper-level Co. personnel (e) Use of technical back-up.
(f) Role in informing NRC, State, other agencies (g) Role in informing public 8.7 Are any new NRC requirements for utilitv emergency planning indicated?
i I
4
. 9.
What was the response of other federal agencies and the state?
9.1 Describe state authority.
9.2 Describe the roles anticipated for other federal agencies.
9.3 Describe analytically and evaluate the roles the state and other federal agencies actually p1 Ayed.
(sane overlap on evacuation with Section 1 and 10).
9.4 Describe the White House role.
f 9.5 Analyze the question of whether NRC made the best use of these other resources.
9.6 What ought the role of the state and other federal agencies be in an accident situation, and how should the NRC utilize them and coordinate with them?
- 10. The public was not adequately informed as to (1) the dangers and potential dangers involved in the accident, (2) releases, and (3) the likelihood of evacuation, and actual implementation of evacuation.
NOTE: There will be some overlap between this section and sections 1 and 9.
A,
/
(~o(('
10.1 Was this due to conscious decisions or rather to negligence, poor coordination, or lack of reliable information on the part of those communicating with the public?
i 10.2 With respect to the ersnitoring of releases, whose responsibility was this, was there adequate l
planning, who did the monitoring, who was supposed to collate the information, how was this actually done, who communicated release informe+4on to the public, and how accurate was it?
i n
i l
.S.g 4
v
, x.
. 10.3 What improvements are necessary to improve monitoring of releases, analysis of data and communication of that data in future accidents (planning, roles of various agencies; equip-ment; coordination, and command and control; backup resources for analysis)?
10.4 Should there have been a complete evacuation Was the evacuation advisory an unnecessary
~-decisions? Was the action that was taken decided in a rational way? Was it implemented effectively? Was planning for it adequate?
How should such decisions be made and imple-mented? How should they be planned for?
10.5 What can be done to improve the quality and timeliness of information made available to the public and to decision-making bodies that must implement evacuation or other public health decisions.
11.0 Do the events surrounding the Three Mile Island accident raise any questins or suggest any genrali-zations as to whether our present institutional approach to the safe delivery of commercial nuclear power, in which the public has apparently q\\,,,
put its faith to date, is indeed adequate?
NOTE: Possible generalizations or questions that
}J)[d might be drawn from the facts as they emerge are listed below. This list is illustrative
/
only; it is intended to stimulate thinking about the types of questions we say want to discuss in our Report, even if we cannot resolve them but can only highlight them as l
issues:
11.1 Does the system of placing primary esponsi-bility for safety on the utility, which typically has the least expertise (compared to the ve:,cor and the NRC), make sense?
e O
I
-,, g.,. ;..,
g
. 11.2 What conclusions can be drawn about the NRC % basic philosophy of setting design goals and letting the vendor develop a design to meet those goals?
This raises the questions of standardization and of greater regulatory involvement in design.
11.3 Are there institutional aspects of the NRC it-self that tend to inhibit its fullfilment of its statutory responsibilities? For exa gle, gn fi an rol 3
M 11.3.1 The history of NRC'S creation from the AEC, and the AEC 'S traditional promotional role.
11.3.2 The Coimmission form of regulation.
Co gare the NRC to other agencies in which regulation of economic behavior 1
is done by Comission (ICC, FTC, CAB, SEC) but the protection of the public health and safety is committed to single-l Administrator groups (FDA, EPA, FAA, MHSA, OSHA).
11.3.3 Does the autonony of the various offices within the NRC, including possible lack of coordination, cometition, mistrust, etc., hager the Comission % work?
11.3.4 Is the Comission plagued by poor central management?
11.3.5 Does the Commission have inadequate staff?
11.3.6 Does physical separation of the offices hinder the work?
i 11.3.7 (fg.h M kd
' - ' pQ.sy aJenMl h tb. 'e
<aM-af tb-PH **
d- -, J I
11.4 Does the Commission have its priorities wron ?
Y l
Does it spend too little time and attention on safety? Too much on trivia? Does it fail to eghasize safety enough?