Responds to 790831 & 1031 Ltrs Re Seismic Design Calculations,Insurance Protection & Radioactive Emissions. Correspondence,Indemnity Agreements,Nuclear Liability Insurance Policies & Info Re 1977 Plant Releases Encl
ML19308B656
Person / Time
Site: Salem, Diablo Canyon, Rancho Seco, Midland, 07001352, Crane  
Issue date: 11/30/1979
From: Knight J
Office of Nuclear Reactor Regulation
To: Calsoyas C
AFFILIATION NOT ASSIGNED
Shared Package
ML19308B655 List:
References
NUDOCS 8001160597
Download: ML19308B656 (300)


Text

._

~

k UNITED STATES

,8

',,, / o NUCLEAR REGULATORY COMMISSION

[t ',E W ASHINGTON, D. C. 20555 5

NOV 3 01979 4

Dr.. C. D. Calsoyas 835 West Cornell Avenue Fresno, CA. 93705

Dear Dr. Calsoyas:

Your letter of August 31, 1979 to Senator Kennedy has been forwarded to the Nuclear Regulatory Consnission by Senator Alan Cranston. We have also received your letter of October 12, 1979 to Mr. Harold Denton. Since some of the information you request is common to both of these letters we have prepared this single response.

With regard to your request for copies of the calculations pertaining to the seismic design of the Three Mile Island Nuclear Power Plants, the Midland Nuclear Power Plant and the Rancho Seco Nuclear Power Plant, please be advised that the NRC does not normally receive such documents. A complete package of seismic design documents for a single nuclear power unit consists of many thousands of pages of calculations and engineering drawings. The NRC Staff performs a detailed review of the criteria to be employed in all aspects of seismic design for a nuclear power plant.

Independent verification of calculations employed in the design of safety related plant structures and equipment is required by NRC regulations (Appendix B to Part 100 of Title 10 of the Code of Federal Regulations) as part of the mandatory quality assurance program conducted by the plant owner. Further, the design calculations for all reactor fluid systems in each plant are included in the stress reports required by the design and fabrication code for these systems (Section III of the Boiler &

Pressure Yessel Code published by the American Society of Mechanical Engineers)l/;

review of these calculations by an independent registered professional engineer qualified in nuclear component design is mandatory under the ASME Code.

With regard to your inquiry as to whether the Rancho Seco and Three Mile Island Nuclear Power Plants have been rated for earthquakes by the Insurance Services Office, we advise that you address this question to the Insurance Services Office or to the Sacramento Municipal Utilities District or the Metropolitan Edison Company, owners of the Rancho Seco and Three Mile Island Nuclear Power Plants, respectively.

In response to your request for copies of the insurance contracts now in force for the Rancho Seco Nuclear Power Plant and the Diablo Canyon Nuclear Power Plant, we have enclosed copit:s of the indemnity agreements and nuclear liability insurance policies for these facilities.

1/Copies of Section III may be purchased fro:r: Tae hrrican Society of Mechanical Engineers, 345 E. 47th. St., New York, New York 10017.

g001160 I k)

N s

x

~

\\

'N l

\\

i Dr$ C. D. Calsoyas

  • 2-NOV 3 01979 In ' response to your request for the estimated radioactive emissions for the Three Mile Island Nuclear Power Plant, we are enclosing the pertinent section (3 pages) f rom NUREG 0521, " Radioactive Materials Released frop Nuclear Power Plants - Annual Report 1977." This information represents the actual plant releases during the year 1977, the latest year for which data has been published. The full report, giving similar data for all nuclear power plants and similar reports for subsequent years when the information is available, may be obtained by writing to the address given below.

National Technical Information Service

/

U. S. Department of Comerce Springfield, Virginia 22161 Sincerely, Driginal Signed By a i

Ja::ies P. Knight James P. Knight, Assistant Director for Engineering Division of Systems Safety Office of Nuclear Reactor Regulation

Enclosures:

1.

Indemnity Agreements & Insurance Policies for Rancho Seco and Diablo Canyon 2.

Pages 139-141 from NUREG-0521 Distribution:

Central File NRR Rdg. File DSS:AD/E Rdg. File M. Groff (NRR-3431)

T. Schultze (NRR-3431) cc:

H. Denton J. Hanchett

'I E. Case H. Berkow W. Russell R. Mattson F. Schroeder J. Saltzman

)

D. Vassallo D. Mailer D. Eisente

,