Forwards IE Insp Rept 50-320/79-18 on 790705-06 & 11-13. No Noncompliance Noted
ML19308B318
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/19/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19308B319 List:
References
NUDOCS 7912280379
Download: ML19308B318 (2)


See also: IR 05000320/1979018

Text

f

pn

UNITED STATES

g

o

NUCLEAR REGULATORY COMMisslord

5\\

,p (

q

R EGION l

$

g

631 PARK AVENUE

KING OF PRUS$t A, PENNSYLVANI A 19406

gv j

....+

Docket No. 50-320

DCT 19 r373

Metropolitan Edison Company

ATTN: Mr. R. C. Arnold, Sr.

Vice President

260 Cherry Hill Road

Parsippany, New Jersey 07054

Gentlemen:

Subject:

Inspection 50-320/79-18

This refers to the inspection conducted by Mr. E. Jernigan of this office on

July 5-6, 11-13, 1979 at the Three Mile Island Nuclear Power Station, Unit 2,

Middletown, Pennsylvania, of activities authorized by NRC License No. DPR-73 and

to the discussions of our findings held by Mr. Jernigan with Mr. J. Wright of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

i ns pector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed in-

spection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifiec the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b)(4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part er the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

79122803 D

p

m

- - -

%-

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

=

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-320/79-18

cc w/ encl:

J. G. Herbein, Vice President Nuclear Operations

E. G. Wallace, Manager Licensing

G. P. Miller, Manager Support Services and Logistics

J. B. Logan, Superintendent Unit 2

G. A. Kunder, Unit 2 Superintendent - Technical Support

J. J. Colitz, Manager Plant Engineering

R. F. Wilson, Director TMI-2 Recovery, Acting

I. R. Finfrock, Jr.

R. W. Conrad

G. F. Trowbridge, Esquire

J. B. Lieberman, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without Report)

!

!