ML19308B318
| ML19308B318 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/19/1979 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19308B319 | List: |
| References | |
| NUDOCS 7912280379 | |
| Download: ML19308B318 (2) | |
See also: IR 05000320/1979018
Text
f
pn
UNITED STATES
g
o
NUCLEAR REGULATORY COMMisslord
5\\
,p (
q
R EGION l
$
g
631 PARK AVENUE
KING OF PRUS$t A, PENNSYLVANI A 19406
gv j
....+
Docket No. 50-320
DCT 19 r373
Metropolitan Edison Company
ATTN: Mr. R. C. Arnold, Sr.
Vice President
260 Cherry Hill Road
Parsippany, New Jersey 07054
Gentlemen:
Subject:
Inspection 50-320/79-18
This refers to the inspection conducted by Mr. E. Jernigan of this office on
July 5-6, 11-13, 1979 at the Three Mile Island Nuclear Power Station, Unit 2,
Middletown, Pennsylvania, of activities authorized by NRC License No. DPR-73 and
to the discussions of our findings held by Mr. Jernigan with Mr. J. Wright of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
i ns pector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed in-
spection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must be accompanied by an affidavit executed by the owner of the
information, which identifiec the document or part sought to be withheld, and
which contains a statement of reasons which addresses with specificity the items
which will be considered by the Commission as listed in subparagraph (b)(4) of
Section 2.790.
The information sought to be withheld shall be incorporated as
far as possible into a separate part er the affidavit.
If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
79122803 D
p
m
- - -
%-
Metropolitan Edison Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
=
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-320/79-18
cc w/ encl:
J. G. Herbein, Vice President Nuclear Operations
E. G. Wallace, Manager Licensing
G. P. Miller, Manager Support Services and Logistics
J. B. Logan, Superintendent Unit 2
G. A. Kunder, Unit 2 Superintendent - Technical Support
J. J. Colitz, Manager Plant Engineering
R. F. Wilson, Director TMI-2 Recovery, Acting
I. R. Finfrock, Jr.
R. W. Conrad
G. F. Trowbridge, Esquire
J. B. Lieberman, Esquire
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without Report)
!
!
l
i