Forwards IE Insp Rept 50-320/79-24 on 790905-06.No Noncompliance Noted
ML19308B302
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/12/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19308B303 List:
References
NUDOCS 7912280330
Download: ML19308B302 (2)


See also: IR 05000320/1979024

Text

Y%

'd

  1. so

UNITED STATES

o

NUCLEAR REGULATORY COMMISSION

y

o

REGION I

$

$

$31 PARK AVENUE

"" C

KING OF PRUS$1 A. PENNSYLVANIA 19406

\\...../

Docket No. 50-320

OCT 121973

Metropolitan FMimn CDmpany

ATIN: Mr. J. G. Herbein

Vice President - Generation

P. O. Box 542

Reading, Pennsylvania 19603

Gentimen:

Subject: Inspection 50-320/79-24

'Ihis refers to the inspection conducted by Mr. G. Walton of this office on

Septaber 5-6, 1979 at Milstead Boiler Ompany, Lynchburg, Virginia, of acti-

vities authorized by NRC License No. DPR-73 and to the discussions of our

findings held by Mr. Walton with Mr. J. Bansch of General Public Utilities

Service Corporation.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, intervicas with personnel, and observations by the

inspector.

Within the scope of this inspection, no itms of noncmpliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Ibm.

If this report

contains any information that you (or your mntractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this

office to withhold such informatiori fim public disclosure. Any such appli-

cation must be accmpanied by an affidavit executed by the owner of the infor-

mation, which identifies the cbcument or part sought to be withheld, and which

mntains a statenent of reasons which addresses with specificity the itms which

l

will be considered by the Cmmission as listed in subparagraph (b)(4) of Section

2.790. 'Ihe information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear frcm you in

l

this regard within the specified period, the report will be placed in the Public

'

Document Ibm.

3

ns3.2280

.

',

'

,

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

h

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-320/79-24

cc w/ encl:

E. G. Wallace, Licensing Manager

J. J. Barton, Project Manager

R. C. Arnold, Vice President - Generation

L. L. Lawyer, Manager - Generation Operations

G. P. Miller, Manager - Generating Station - Nuclear

J. B. Logan, Unit 2 Superintendent

G. A. Kunder, Unit 2 Superintendent - Technical Support

I. R. Finfrock, Jr.

Mr. R. Conrad

G. F. Trowbridge, Esquire

J. Lieberman, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(WithoutReport)

[