ML19308B030

From kanterella
Jump to navigation Jump to search
Forwards RO Re 230 Kv Switchyard Isolation on 740114
Date released: 11/18/2019 Download: ML19308B030


Ro:On 740104,230 Kv Switchyard Between Keowee & Oconee Isolated.Caused by Spurious Signal Actuation solid-state Breaker Failure Relays Located in Switchyard.Affected Cable Circuits Disconnected at Relays on Interim Basis
ML19308B035
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/14/1974
From:
DUKE POWER CO.
To:
References
Download: ML19308B035 (2)
Forwards RO Re 230 Kv Switchyard Isolation on 740114
ML19308B029
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/14/1974
From: Thies A
DUKE POWER CO.
To: GIAMBUSSO A
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML19308B029 (2)